TE-09f Fugitive Dust Control Form 06-Backfilling
Updated
A PDF document (777 KB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).
File name: TE-09f Fugitive Dust Control Form 06-Backfilling.pdf
The full file is for paid members, or buy this bid alone.
Preview
Dugway Proving Ground Fugitive Dust Control Plan Form 06 Construction & Demolition
Backfilling Area Previously Excavated or Trenched
Activity Description: The process to refill an area(s) in which material has been removed.
General Information
Location(s):
Start Date:
End Date:
Point of Contact:
Email:
Phone Number:
Description of site:
Fugitive Dust Emission Control Techniques
Select at least one best management practice (BMP) for each critical mitigation area: Stabilize backfill material when not actively handling. BMP 06-01 Water backfill material to maintain moisture or to form crust. BMP 06-02 Apply and maintain a chemical stabilizer to backfill material to form crust. BMP 06-03 Cover (natural or synthetic) or enclose backfill material when not actively handling. Stabilize backfill material during handling
BMP 06-04 Empty loader bucket slowly and minimize drop height from loader bucket. BMP 06-05 Dedicate water truck or large hose to backfilling equipment and apply water as needed. BMP 06-06 Mix moist soil with dry soil until the optimum moisture is reached. BMP 06-07 Apply and mix water into the backfill material until optimum moisture is reached. Apply and mix water and chemical solution into the backfill material until optimum moisture is reached. BMP 06-08
(Name of chemical:
Stabilize soil at completion of backfilling activity
)
BMP 06-09 Apply water and maintain disturbed soils in a stable condition. BMP 06-10 Apply and maintain a chemical stabilizer on disturbed soils to form a crust. (Name of chemical:
)
Stabilize material while using pipe padder equipment
BMP 06-11 Mix moist soil with dry soil until the optimum moisture is reached. BMP 06-12 Dedicate water truck or large hose to equipment and apply water as needed. BMP 06-13 Not applicable
Logbook Requirement
If suppression is used, a logbook is required, at minimum, it must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.
Trackout Prevention
In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly. *By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 1442-Solicitation DPG Horizontal Construction
- Attachment 1: Scope of Work W911S6 Construction Horizontal FY27 - FY 31
- Standard Specification Book Rev
- Paving IDIQ Airfield Specifications
- Materials Manual of Instruction
- Min Sampling an Testing
- Quality Management Plans
- Work Zones
- Dust Control Forms
- TE-09a Fugitive Dust Control Form 01-Crushing
- TE-09b Fugitive Dust Control Form 02-Screening
- TE-09c Fugitive Dust Control Form 03-Stockpiles