TL Contract Data Requirements List A022 Backflow Prev Sys Rpt Samplev2
Updated
A PDF document (688 KB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).
File name: TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf
The full file is for paid members, or buy this bid alone.
Preview
CDRL A022 Backflow Prevention Systems Report Apr - Jun 202X SAMPLE TEST MONTHS: ZONE 1-Sept/Mar; ZONE 2-Oct/Apr; ZONE 3-Nov/May; ZONE 4-Jun/Dec; ZONE 5-Jan/Jul; ZONE 6-Feb/Aug; ZONE 7-Mar/Sep A
B
D
E
F
ZONE
BLDG
EQUIPMENT ID NO.
MFR
MODEL
G
H
I
J
SERIAL
NUMBER
SIZE
LOCATION
HAZARD
TYPE
N2301120946
H42837
J001590
3"
3/4"
3/4"
Bottom of the Hill on right side of road
Mechanical Room - Chiller Make-Up Water
Boiler Room - Make-Up Water
J013765
3/4"
L
K
N
O
LAST TEST
DATE
Pass/Fail
NEXT
TEST
September
September
September
3/20/2026
3/20/2026
P
P
9/30/2026
9/30/2026
3/20/2026
P
9/30/2026
Mechanical Room - Chiller Make-Up Water
High
March
BACKFLOW DEVICES LOCATED AT VAFB
September
3/20/2026
P
9/30/2026
10/24/2025
P
9/30/2026
Annual Test Schedule
M
P
Comments
BACKFLOW DEVICES LOCATED AT PILLAR POINT
1-01-001-RP
10-01-001-RP
13-01-001-RP
Febco
Febco
Febco
13-01-002-RP
Febco
75-01-001-DC
825Y
LF
825Y
825Y
High
High
High
March
March
March
75-001
3/4"
North end of Bldg.-AHU room Make-up to humidifiers
Low
September
75-01-001-RP
Wilkins
975XL
DC
Febco RP 825Y
H37315
3/4 "
South - Boiler room Heating make-up water
High
September
75-01-002-RP
Febco RP
825Y
H05458
1"
Mechanical room chiller water make-up
High
175-01-001-RP
Watts
009QT
475378
1/2"
Make-Up water closed loop heating system-Mech Rm
High
178-01-001-RP
Watts
1/2"
Make-Up water closed loop heating system-Mech Rm
High
475-00-001-RP
Wilkins
LF009Q
T
975XL
37947
2860560
3/4"
High
475-00-003-RP
Febco
3078
J004799
3/4"
475-01-002-RP
Febco
825Y
A054475
3/4"
Outside - Chiller Water Make Up - North side of
facility
Outside - Chiller Water Make Up - North side of
facility
Boiler Room - Boiler make up water
High
500-01-001-RP
Febco
825Y
J001047
3/4"
A/H Mechanical Room - Chilled Water make-up
High
March
March
March
March
March
September
September
September
September
3/25/2026
P
9/30/2026
3/25/2026
P
9/30/2026
3/10/2026
F
9/30/2026
3/10/2026
P
9/30/2026
3/10/2026
P
9/30/2026
3/10/2026
P
9/30/2026
3/10/2026
P
SAMPLE
High
510-01-001-RP
Febco
825Y
H20445
3/4"
Mechanical room - Make- up chilled water
High
525-01-001-RP
Febco
825Y
J012067
2"
Bottom Interior Protection Inside Southwest wall
High
525-01-002-RP
Watts
957QT
LH-2077
3"
Top Interior Protection Inside Southwest wall
High
730-00-001-DC
Watts
109699
6"
Fire Suppression System-Outside West End
Low
March
March
March
March
March
March
September
September
September
September
September
September
3/28/2026
730-00-002-DC
Watts
730-01-001-RP
Wilkins
975 XL3
20400
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: FRAME Performance Work Statement - draft
- Attachment 2: Apdx H Environmental Reqs - draft
- Attachment 2: Apdx J Antenna Tower Resp List draft
- Attachment 3: Consolidated DID Files draft
- Attachment 4: FRAME Incentive Plan - Draft
- Attachment 5: Appendix B Wage Rate Tables redacted
- Attachment 5: CBA IBEW 2024 12949 Appdx A redacted
- Attachment 6: DB Wage Determination (Mod 5)
- Attachment 6: DB Wage Determination (Mod 6)
- Attachment 8: Section L - draft
- Attachment 9: Section M - draft
- Request for Information Atch 1 Industry Day Agenda 22