TL Contract Data Requirements List A027 Testing and Cert Samplev2
Updated
A PDF document (664 KB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).
File name: TL CDRL A027 Testing and Cert Samplev2.pdf
The full file is for paid members, or buy this bid alone.
Preview
CDRL A027 Testing Certification Report
April - June 202X
SPECIFIC
ISI
TASKS
UTV
UNIQUE ISI
LAST
PERFORMED
201812
UNIQUE ISI
NEXT
INSPECTION
DATE
202812
FAC NBR
LOCATION
PEMO
PEMO
PV #
PV-128
PV-129
ITEM DESCRIPTION
BREATHING AIR TANK PV-128, 338 CF, MONOBLOC DESIGN
BREATHING AIR VESSEL PV-129, 338 CF, MONOBLOC DESIGN
INSPECTION
External Visual Examination
External Visual Examination
RATING
Acceptable
Rejectable
INSPECTION
DATE
202601
202601
NEXT INSPECTION
DATE
202701
202701
PEMO
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
HSF
PV-130
PV-132
PV-133
PV-134
PV-135
PV-136
PV-137
PV-143
PV-144
PV-145
PV-146
PV-147
PV-148
PV-149
PV-156
PV-157
PV-158
PV-150
PV-151
LIQUID AIR TANK PV-130, 400 GAL, HORZ
External Visual Examination
HORIZONTAL N204 VESSEL PV-132, TK-201, 28,000 GAL
External Visual Examination
HORIZONTAL N204 VESSEL PV-133, DEACTIVATED, TK-202, 28,000 GA External Visual Examination HORIZONTAL N204 VESSEL PV-134, DEACTIVATED, TK-203, 28,000 GA External Visual Examination
HORIZONTAL N204 VESSEL PV-135, TK-204, 28,000 GAL
External Visual Examination
HORIZONTAL PV-136, DEACTIVATED, TK-205, 28,000 GAL
External Visual Examination
HORIZONTAL N204 VESSEL PV-137, TK-206, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-143, SEPARATOR
External Visual Examination
PRESSURE VESSEL PV-144, SEPARATOR
External Visual Examination
PRESSURE VESSEL PV-145, 338 CF, MONOBLOC DESIGN
External Visual Examination
PRESSURE VESSEL PV-146, TK-101, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-147, DEACTIVATED, TK-102, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-148, TK-103, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-149, TK-104, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-156, SEPARATOR
External Visual Examination
PRESSURE VESSEL PV-157, SEPARATOR
External Visual Examination
PRESSURE VESSEL PV-158, 338 CF, MONOBLOC DESIGN
External Visual Examination
PRESSURE VESSEL PV-150, TK-105, 28,000 GAL
External Visual Examination
PRESSURE VESSEL PV-151, TK-106, 28,000 GAL
External Visual Examination
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Other
Acceptable
Acceptable
Other
Acceptable
Other
Other
Other
Acceptable
Acceptable
202601
202604
202604
202604
202604
202604
202604
202604
202604
202604
202605
202605
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: FRAME Performance Work Statement - draft
- Attachment 2: Apdx H Environmental Reqs - draft
- Attachment 2: Apdx J Antenna Tower Resp List draft
- Attachment 3: Consolidated DID Files draft
- Attachment 4: FRAME Incentive Plan - Draft
- Attachment 5: Appendix B Wage Rate Tables redacted
- Attachment 5: CBA IBEW 2024 12949 Appdx A redacted
- Attachment 6: DB Wage Determination (Mod 5)
- Attachment 6: DB Wage Determination (Mod 6)
- Attachment 8: Section L - draft
- Attachment 9: Section M - draft
- Request for Information Atch 1 Industry Day Agenda 22