Home / Facility Readiness and Maintenance Execution (FRAME)… / Document

TL VSFB CCCPM for Submittal to DDWv2

Updated

A PDF document (4.4 MB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).

File name: TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

BY ORDER OF THE COMMANDER

30TH CIVIL ENGINEER SQUADRON

VANDENBERG SPACE FORCE BASE

SUPPLEMENT 32-1067

23 JUN 2025

Civil Engineering

VANDENBERG SFB CROSSCONNECTION CONTROL MANUAL

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

ACCESSIBILITY: Publications and forms are available by request ([email protected])
RELEASABILITY: There are no releasability restrictions on this publication.

OPR: 30 CES/CEIE

(Mr. Mike Kalata)

Certified by: 30 CES/CC
Pages: 21

Supersedes:

N/A

This supplement applies to all units assigned or attached to Vandenberg Space Force Base (hereinafter referred to as Vandenberg SFB, Vandenberg, VSFB, or the Base), to include any Department of Defense (DoD) associate/tenant organizations, federal and state agencies, lessees, commercial customers, and residents (hereinafter referred to as Independent Agencies, or IAs)1 whose facilities or equipment is connected to the VSFB drinking water system. It supplements the Cross-Connection and Backflow Prevention portions of Department of the Air Force Manual (DAFMAN) 32-1067, Civil Engineering Water and Fuel Systems. This supplement establishes policy and provides further instruction and guidance in the local management of the Vandenberg SFB Cross-Connection Control and Backflow Prevention (CCCBP) Program pursuant to state regulations contained within the California Health and Safety Code (CHSC), sections 116407 and 116555.5 and established in the State Water Resources Control Board (SWRCB) approved Cross-Connection Control Policy Handbook (CCCPH) and conditions stipulated in the Vandenberg SFB water permit issued by the SWRCB Division of Drinking Water. Other applicable standards are referenced in the California Plumbing Code (CPC) and the Uniform Plumbing Code (UPC). Also, as defined in the CCCPH, Article 3, Section 3.3.3, Vandenberg SFB reserves the right to implement additional requirements beyond Department of the Air Force (DAF)

Independent Agencies are organizations or entities that are not under the direct supervision or control of the Vandenberg Cross Connection Control Program Manager.

VANDENBERG SFB

CROSS-CONNECTION CONTROL MANUAL 32-1067- 23 June 2025

or state regulations regarding the CCCBP Program to further protect public health and to safeguard the Vandenberg SFB public water supply and system. This supplement applies to all drinking water systems located on VSFB property and its geographically separated units (GSUs).

Chapter 1 OVERVIEW

1.1.

1.2.

1.3.

Chapter 2 ROLES AND REPONSIBILITIES

2.1.

2.2.

The beginning of the document. Download the full file to read on.

Other documents in this bid