CG-201
12'-0" (TYP.)
12'-0" (TYP.)
EX. POND PROFILE
DESIGN STANDING
WSE = 893.25'
A
A
EL. 889.25'
EL. 886.75'
NEW AGGREGATE, LINER, AND SAND
EXCAVATION
SECTION - WET DETENTION POND (LONGITUDINAL)
3/16" = 1'-0"
EX. CLEANOUT
REMOVE HARDENED
IDENTIFIER LAYER
1'-0"
REMOVE TOPSOIL &
COMPACTED FILL
1'-0"
B
B
MODIFY EX. SWM INLET
EL. 898.0'
CU-201
EX. POND
PROFILE
INLET EL. 893.25
WSE = 893.25'
EX. BERM
DRAIN INV. EL. 893.5
EX. DRAIN
EL. 889.25'
SECTION - WET DETENTION POND
REMOVAL
REPLACE EXISTING TURF/SOD
(SEE LANDSCAPE)
3/16" = 1'-0"
COMPACTED BACKFILL
SAND IDENTIFICATION COURSE;
4" NATURAL SAND LAYER
REPLACE TOPSOIL. CONTRACTOR TO
USE NEWLY IMPORTED TOPSOIL
CLAY LINER REPLACED IN KIND
ANCHOR TRENCH. BACKFILL W/
EXCAVATED MATERIAL
2'-0"
CG-201
SAND
1'-6"
18"
12"
D
D
EXISTING CLAY LINER
3'-0"
TOPSOIL
12" AGGREGATE COVER
EPDM LINER, 45 MIL
BETWEEN TWO
GEOTEXTILE LAYERS
EX. IRRIGATION LINE
EX. PRECAST
LAWN CRYPTS
REPLACEMENT (END VIEW)
REPLACEMENT (SIDE VIEW)
POND LINER INSTALLATION INTO SLOPE
SAND IDENTIFICATION COURSE;
4" NATURAL SAND LAYER
GRAVESITE GRID
MONUMENT
EX. CLEANOUT
WSE = 893.25'
COMPACTED BACKFILL
REPLACE EXISTING TURF/SOD
1'-8" MIN
COVER
TOP OF LINER
EL. = 896.0
REPLACE TOPSOIL. CONTRACTOR TO
USE NEWLY IMPORTED TOPSOIL
3' GEOTEXTILE INTERFACE STRIP B/T
AGGREGATE & CLAY
1'-10" MAX
COVER
REMOVE
CLAY LINER
VARIES
EXISTING CLAY LINER
(TO REMAIN)
EX. PRECAST
LAWN CRYPTS
C
C
EL. 886.75'
1'-8" MIN
1'-10" MAX
COVER
EXISTING SWM OUTLET
STRUCTURE
1/4" = 1'-0"
4" IDENTIFIER LAYER REMOVE AND REPLACE
1/2" = 1'-0"
E
E
45 MIL EPDM LINER B/T TWO GEOTEXTILE LAYERS,
FIRESTONE PONDGUARD OR APPROVED EQUIVALENT CG-201
12" AGGREGATE
1'-0"
3" SEAM OVERLAP
EPDM PRIMER, QUICKPRIME PLUS OR
APPROVED EQUIVALENT (SEE NOTE 1)
3" WIDE BUTYL ADHESIVE SEAM TAPE,
FIRESTONE QUCKSEAM SPLICE TAPE
OR APPROVED EQUIVALENT (SEE NOTE 2)
1'-6"
GEOTEXTILE
45 MIL EPDM POND LINER,
FIRESTONE PONDGUARD
OR APPROVED EQUIVALENT
45 MIL EPDM POND LINER,
FIRESTONE PONDGUARD
OR APPROVED EQUIVALENT
DIRECTION OF WATER FLOW
SAND
1.
CLEAN AND DRY THE AREAS TO BE JOINED WITH A LINT-FREE CLOTH AND APPROVED CLEANER, THEN APPLY EPDM PRIMER TO SEAM AREAS OF BOTH LINERS. ALLOW PRIMER TO FLASH BEFORE APPLYING SEAM TAPE.
2.
CAREFULLY ALIGN AND APPLY DOUBLE-SIDED SEAM TAPE TO LOWER LINER FIRST. ROLL TO ELIMINATE AIR POCKETS. REMOVE BACKING FROM TOP OF SEAM TAPE AND LAY UPPER LINER SECTION ONTO IT. USING A WEIGHTED ROLLER, COMPRESS ENTIRE SEAM
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Jessamine Camp Nelson Building
- Jessamine Camp Nelson Heavy
- Jessamine Camp Nelson Highway
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1