From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
Updated
A PDF document (15.0 MB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 13, 2026, 9:00 AM (UTC-5).
File name: S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
LEGEND
A
Irrigation Control Valve
Corrugated Plastic Pipe
Electric Transformer
Pine
Unknown Tree
Fence
Underground Water Line
Underground Electric Line
Underground Drainage Pipe
Line Continues
End of Information
A
Land Surveying Permit
Professional Land Surveyor
Spot Elevation
Spot Elevation on Hard Surface
Back of Curb Elevation
Edge of Pavement Elevation
Grave Stone
Catch Basin
Storm Manhole
Water Meter
Cleanout
Square Post
B
A.
B.
C.
D.
E.
G.
H.
ARV for water main.
Unable to locate underground electric line continuation. Unable to locate water main with EM or GPR methods.
GPR was limited to 1.5' depth due to ground conditions. Test holes are recommended to verify the locations of
underground utilities.
Unable to locate underground power coming off generator with EM or GPR methods.
Unable to trace water valves and spigots to main with EM or GPS.
B
SUBSURFACE UTILITY ENGINEERING NOTES
1.
C
2.
3.
VF-202
VF-203
4.
5.
6.
D
D
VF-204
VF-203
7.
Paper copies of this survey are not valid without the original signature and seal of a Kentucky Professional Land Surveyor. Digital copies are not valid without the digital signature of a Kentucky Professional Land Surveyor.
The horizontal datum utilized for this project is North American Datum (NAD) 1983 Kentucky North Zone, 2011 Adjustment, U.S. Survey Feet. Said datum was established by performing a rapid static GPS session and utilizing National Geodetic Survey's (NGS) Online Positioning User Service (OPUS).
The vertical datum utilized for this project is North American Vertical Datum (NAVD) 1988, U.S. Survey Feet. Said datum was established by performing a rapid static GPS session and utilizing National Geodetic Survey's (NGS) Online Positioning User Service (OPUS).
The field work performed in support of this survey was
completed by SurvTech, on March 9, 2023.
The surveyor only certifies the mobile LiDAR mapping and supporting land surveying, not the interpretation of pavement conditions.
Subsurface utilities depicted hereon were obtained using a Sensors and Software 250MHz LMX GPR and a Vivax Metrotech vLocPro utility locator and classified by observing above ground indicators in the field.
THIS IS NOT A BOUNDARY SURVEY.
C
SURVEYOR'S NOTES
E
F
F
E
KEY
NOT TO SCALE
Bid Set
N ATIONAL
C EMETERY
A DMINISTRATION
Survtech Solutions, Inc.
WFS
Revisions
Walker Federal Services, LLC
7820B-162 Wormans Mill Road
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Jessamine Camp Nelson Building
- Jessamine Camp Nelson Heavy
- Jessamine Camp Nelson Highway
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- CNNC FCA Corrections CONS BD SPECIFICATIONS