CNNC FCA Corrections CONS BD SPECIFICATIONS
Updated
A PDF document (12.6 MB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 13, 2026, 9:00 AM (UTC-5).
File name: S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf
The full file is for paid members, or buy this bid alone.
Preview
VA Project No. 833CM3030
Correct FCA Deficiencies
Camp Nelson National Cemetery, KY
BID DOCS
1-7-2026
DEPARTMENT OF VETERANS AFFAIRS
NCA MASTER SPECIFICATIONS
Section 00 01 10
00 01 10
00 01 15
DIVISION 00 - SPECIAL SECTIONS
DATE
List of Drawing Sheets
07-25
07-25
DIVISION 01 - GENERAL REQUIREMENTS
01 00 02
01 32 17
01 33 23
01 35 26
01 42 19
01 45 00
01 56 39
01 57 19
01 74 19
01 91 00
General Requirements (Minor NCA Projects)
Network Analysis Schedules
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Tree and Plant Protection
Temporary Environmental Controls
Construction Waste Management
General Commissioning Requirements
07-25
07-25
07-25
07-25
07-25
07-25
07-25
07-25
07-25
07-25
DIVISION 02 – EXISTING CONDITIONS
02 41 10
02 82 11
02 83 33.13
Demolition and Site Clearing
Traditional Asbestos Abatement
Lead-Based Paint Removal and Disposal
07-25
07-25
07-25
DIVISION 03 – CONCRETE
03 30 53
(Short-Form) Cast-in-Place Concrete
07-25
DIVISION 04 – MASONRY
04 05 13
04 05 16
04 05 31
04 20 00
Masonry Mortaring
Masonry Grouting
Masonry Tuck Pointing
Unit Masonry
07-25
07-25
07-25
07-25
DIVISION 05 – METALS
05 50 00
Metal Fabrications
07-25
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00
06 20 00
Rough Carpentry
Finish Carpentry
00 01 10-1
07-25
07-25
VA Project No. 833CM3030
Correct FCA Deficiencies
Camp Nelson National Cemetery, KY
100%
BID DOCS
CD1
7-8-2025
1-7-2026
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19
07 08 00
07 41 13
07 42 43
07 60 00
07 92 00
Reroofing Prep
Facility Exterior Closure Commissioning
Standing Seam Metal Roofing
Plastic Panel
Flashing and Sheet Metal
Joint Sealants
07-25
07-25
07-25
07-25
07-25
07-25
DIVISION 08 - OPENINGS
08 11 13
08 14 00
08 33 00
08 71 00
08 80 00
Hollow Metal Doors and Frames
Interior Wood Doors
Coiling Doors and Grilles
Door Hardware
Glazing
07-25
07-25
07-25
07-25
07-25
DIVISION 09 – FINISHES
09 06 00
09 29 00
09 30 13
09 51 00
09 65 13
09 67 23
09 91 00
09 96 59
Schedule for Finishes
Gypsum Board
Tiling
Acoustical Ceilings
Resilient Base and Accessories
Resinous Flooring
Painting
Tile Coating System
07-25
07-25
07-25
07-25
07-25
07-25
07-25
07-25
DIVISION 10 – SPECIALTIES
10 14 05
10 21 13
10 28 00
10 51 13
10 75 00
Interior Signage
Toilet Compartments
Toilet and Bath Accessories
Metal Lockers
Flagpoles
07-25
07-25
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Jessamine Camp Nelson Building
- Jessamine Camp Nelson Heavy
- Jessamine Camp Nelson Highway
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1