From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
Updated
A PDF document (16.7 MB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 13, 2026, 9:00 AM (UTC-5).
File name: S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
LEGEND
PROPERTY LINE
W
EXISTING 2" WATER LINE
2" DR17 HDPE WATER LINE
6" SCH. 40 PVC DRY HYDRANT LINE
W
A
UW
A
D
7-11 SINGLE/DOUBLE
CU-202CATCH BASIN
UW
D
SHT CU-103
Ex.
6'
C
hain
Link
Gra
v
el
Driv
e
D
Ex.
Ex.
' C
hain
UW
D
Ex.
Concr
et
Draina e
Struct ge
ure
Link
Ex.
C
Gra
vel
Driv
e
B
B
D
SHT CU-104
UW
UW
W
UW
Ex. 14
"
Tree
W
Ex. 6"
Maple
Ex. 4"
x4" W
ood
Post
(Typ.)
Ex. 4"
Post
"
e "A
Driv
Ex. Edge
of Conc.
NOTES
e
Driv
x4" W
ood
(Typ.)
Ex. 5"
Oak
Ex. 5"
Maple
Ex.
Conc.
Pad
Ex. Edge
of Asphalt
Ex.
Edge of
Conc.
Ex. 8"
Headw
Ex.
all
Conc.
Draina
Struct ge
ure
Ex. 12
"
Maple
Ex. 8"
Pin Oa
k
Ex. 7"
Suga
r Map
As
p
Wa
ll
2. WATER SUPPLY PIPING SHALL BE DISINFECTED IN
ACCORDANCE WITH AWWA C651.
ha
lt
al
l
Dr
iv
e
Ex. 7"
Maple
3. PRESSURE TEST WATER PIPING BY PRESSURING TO 140 PSI
FOR 4 HR PERIOD, ADDING MAKEUP WATER AS NECESSARY.
OBSERVE FOR 2 HOURS WITHOUT MAKEUP. ZERO PRESSURE
LOSS PERMITTED.
Com
mitt
Shelte al
r
Conc.
Pad
le
Conc.
Inv.
Draina
6"
Struct ge CPP=91
ure
7.50
W
As
ph
al
t
Ed
Dr
ive
Ed ge
ge of
of Pv
C mt
on .
c.
av
el
Ex. 10
Pin Oa "
k
Ex. 10
Pin Oa "
k
W
Conc.
Pad
Ex.
Dogw 4"
ood
Ex. C
onc.
Pad/
Flag
Pole
8"
U
Ex. 8"
Maple
8"
Ex. 4"
x4" W
ood
Post
(Typ.)
Ex. 8"
Maple
Ex. 8"
Tree
Gr
av
el
Gr
av
el
Ex. 8"
Maple
SHT CU-102
Ex. 5"
Tree
Gr
C
Ex. 9"
Maple
1. ALL EQUIPMENT, COATINGS, LININGS, OR MATERIAL IN
CONTACT WITH WATER DISTRIBUTION PIPINGSHALL BE NSF
61 APPROVED.
C
Ex. Edge of
alt
ph
As
UW
Ex.
UW
ge
Ed
l
Ex. Grave
of
UW
Ex. 8"
Maple
4. COMPLY WITH ALL KENTUCKY AND LOCAL REGULATIONS.
Ex. 12
"
Maple
5. DAMAGE TO EXISTING UTILITIES CAUSED BY CONSTUCTION
SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE, WHETHER
UTILITY IS SHOWN ON DRAWINGS OR NOT. PROBE, EXPLORE,
AND ADVANCE EXCAVATION SLOWLY AS NECESSARY TO
PREVENT DAMAGE.
W
Ex.
White 5"
Oak
UW
Ex
White. 5"
Oak
Ex.
White 3"
Oak
Ex.
White 4"
Oak
Ex. C
Ex. A
spha
lt Dri
Ex. C
ur
Ex. 8'
Ex.
Conc.
Ex.
White 2"
Pad
ConOa
c. kPa
d
urb
ve
b
Chain
link
Fenc
e
D
D
W
EW
E W
E
E
UW
UW
KEY
W
UW
W
940.16
E
F
UW
940.32
W
941.88
W
W
CU-105
W
W
F
F
CO
CO
E
CU-105
CO
OL
NOT TO SCALE
Bid Set
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Jessamine Camp Nelson Building
- Jessamine Camp Nelson Heavy
- Jessamine Camp Nelson Highway
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- From CNNC FCA Corrections CONS BD DRAWINGS VOL 1
- CNNC FCA Corrections CONS BD SPECIFICATIONS