Home / Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA… / Document

From CNNC FCA Corrections CONS BD DRAWINGS VOL 1

Updated

A PDF document (17.2 MB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 13, 2026, 9:00 AM (UTC-5).

File name: S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

GENERAL NOTES

B

B

A

FOR LIGHTNING PROTECTION GENERAL NOTES, SEE DRAWING

E-003.

A

1.

A
E-003

GROUNDING GRID

CONDUCTOR (TYP.)

G

G

LEGENDS

TW

C

C

B
E-003

GROUNDING CONDUCTOR

LIGHTNING CONDUCTOR

GROUNDING

TEST WELL

G

GROUND ROD

GROUNDING TEST WELL

TW

RUN DOWN CONDUCTOR DOWN AND

BOND TO BUILDING GROUND ROD. (TYP.)

RUN DOWN CONDUCTOR IN RIGID

CONDUIT 8' FROM GROUND UP AND

EXPOSED, MOUNTED ON WALL.

PANEL C

(LOCATED INSIDE

THE BUILDING)

AIR TERMINAL

A

LIGHTNING CONDUCTOR

RUN ALONG ROOF,

FASTENED EVERY

3 FEET MAX.

D
E-003

AIR TERMINAL (TYP.)

E
E-003

D

D

LIGHTNING

CONDUCTOR

"T" JOINT

CONNECTION (TYP.)

KEY PLAN

A

E

A

E

A

GROUND ROD

(TYP.)

TW

G

G

F

F

AREA OF WORK

NOT TO SCALE

ELECTRICAL GROUNDING AND LIGHTNING PROTECTION PLAN

SCALE : 1/2" = 1'-0"

SCALE : 1/2" = 1'-0"

Bid Set

SITE PLANS

WFS

STUTE

A
E

Walker Federal Services, LLC

N ATIONAL

C EMETERY

A DMINISTRATION

NGINEERING

7820B-162 Wormans Mill Road
Frederick, Maryland 21701

Creative Designs | Intelligent Solutions

ASTUTE ENGINEERING, PLLC.
Revisions

1945 OLD GALLOWS ROAD, STE 201, VIENNA, VA 22182

PH: (202) 400-2004 I WWW.ASTUTENG.COM

Date

1'

2'

4'

Drawing Title

Project Title

HISTORIC BRICK STABLE BLDG

ELECTRICAL GROUNDING AND

LIGHTNING PROTECTION PLAN

Correct FCA Deficiencies

Approved:

Building Number
HA2

Approved:

Location

CAMP NELSON NATIONAL CEMETERY

Date

JANUARY 7, 2026

Project No.
833CM3030

Checked

UB,HU

© COPYRIGHT 2022, Walker Federal Services, LLC

6'

Drawn
SV

DRAWING NO.

EN-204
Dwg. 130 Of 166

B

B

A

A

1.
2.

C

3.
4.

5.

6.
7.
8.

REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

REQUIREMENTS.

FOR GENERAL SYMBOLS, MATERIALS AND ABBREVIATIONS, SEE A-001

THROUGH A-003.
FOR ROOF DETAILS, SEE SHEET AE-501.

COORDINATE EXISTING ROOF PENETRATIONS WITH MEP DRAWINGS. ALL

ABANDONED LINES ARE TO BE REMOVED IN THEIR ENTIRETY, SUBSTRATE

TO BE PATCHED WITH LIKE MATERIALS AT SIMILAR THICKNESS AS

ADJACENT.

CONTRACTOR SHALL UTILIZE ALL ROOFING MANUFACTURER

RECOMMENDED ACCESSORIES TO PROVIDE ADEQUATE ROOF

PENETRATION WATERPROOFING. SEE ROOF DETAILS FOR MORE

INFORMATION.

ALL CONDUIT TO BE REPLACED WITH NEW. PAINT ALL EXPOSED EXTERIOR

CONDUIT SHERWIN WILLIAMS "CLASSICAL WHITE".
PAINT DOOR AND FRAME #18 SHERWIN WILLIAMS "CLASSICAL WHITE".

GARAGE DOORS TO BE FACTORY FINISHED TO MATCH SHERWIN WILLIAMS

"CLASSICAL WHITE". PAINT FRAME SHERWIN WILLIAMS "CLASSICAL

WHITE".

C

NOTES

30'-0"

26'-0"

±2'-0"

D

D

2'-9"

±1'-6"

CONTINUOUS RIDGE VENT

NEW SPOILS SHED

SEE DRAWING AE-141 AND 142 FOR DETAILS

KEY

PREFINISHED STANDING SEAM METAL

ROOF (DARK BRONZE) TO MATCH

The beginning of the document. Download the full file to read on.

Other documents in this bid