VA Project No. 833CM3030
Correct FCA Deficiencies

Camp Nelson National Cemetery, KY
100% CD2
7-8-2025

SECTION 23 11 13

FACTORY-ASSEMBLED ABOVEGROUND STORAGE TANK (FAST) SYSTEM

PART 1 – GENERAL

1.1
A.
B.

1.2

RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
Specification Sections, apply to this Section.
Related Sections:
1.
Division 26 – Electrical connections.

SUMMARY

A.

This Section includes furnishing and installing an aboveground, premanufactured, protected secondary containment fuel storage tank system for diesel fuel.

B.

Provide factory assembled and integrated Factory-Assembled Aboveground Storage Tank (FAST) System with pre-plumbed dispensing systems, factory installed vents, valves, and appurtenances. This specification requires that the system design, manufacture, and integration to be the responsibility of one specialized manufacturer in order to maintain quality through the steps of procurement, manufacturer, integration, and field installation. Non-factory assembled, substitutions are not acceptable, and will not be considered for this project.

C.

The FAST System shall include a specialty fuel system sub-panel, emergency stop (ESO), and point-to-point wiring diagram to facilitate ease of installation for all system components.

D.

Certifications: Each FAST System storage tank shall bear the Underwriters Laboratories UL 2085 label for Protected Secondarily Contained Aboveground Tanks for Flammable Liquids.

E.

Delivery, Storage, and Handling: Coordinate delivery to allow crane offloading and placement in prepared and final location, minimizing the need for double handling. Keep FAST System protected from physical damage caused by other construction activities.

F.

Field Measurements: Field-verify horizontal and vertical dimensions, clearances, and setbacks of spaces where FAST Systems will be installed prior to fabrication of FAST under this section.

G.

Warranty Periods:
1.

2.

FAST System: Warranted by the manufacturer against defects in material or workmanship for 30 years following the delivery of the tank. Warranties that limit such coverage for shorter periods and/or limit the primary tank warranty to failure solely due to non-corrosion related cracking, breakup, or collapse will not be permitted.
Not less than one (1) year for parts, work quality, and installation.