Amendment 4- - BID - from - - BID - SET

Updated

A PDF document (1.1 MB) attached to Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA Deficiencies, from the Department of Veterans Affairs. Due Dec 7, 2026, 9:00 AM (UTC-5).

File name: Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

LEGEND

LEACH FIELD POINT REPAIR

EXISTING SANITARY SEWER LINE

6" GRAVITY DISTRIBUTION PIPING

EX. LEACH FIELD LATERAL

SOIL BORINGS

PERFORM PIPE CCTV INVESTIGATION

& SELECTED LATERAL DRAIN POINT

REPAIRS (SEE NOTE 5)

CU-201

SEPTIC DISTRIBUTION BOX,
02 EX.

APPROX. INV. DEPTH 934.10

SERVICE EXISTING 1000 GAL SEPTIC TANK,

03 INV. 934.16 (SEE NOTE 2)

B-1

6" SCH 40 PVC SANITARY SEWER PIPE,

PROFILE SMOOTHLY BETWEEN EXISTING

INVERTS (SEE NOTE 4)

DE-ENERGIZE, TEMPORARILY RELOCATE OR

EXCAVATE AROUND WHILE IN PLACE, AND

REINSTALL BURIED ELECTRICAL SERVICE IF

NECESSARY FOR POINT REPAIR.

A

A

KEYNOTES

S.S. FULL BODY SERVICE TAP, ROMAC

04 SHIELDED TRANSITION COUPLING

CO

G

BRACE POLE DURING EXCAVATION.
COORDINATE WITH UTILITY PROVIDER.

REINSTALL/RETURN PROPANE STORAGE

TANK TO SERVICE. PROVIDE ALL NECESSARY

FITTINGS, HARDWARE, & SPECIALS.

(SEE NOTE 7)

RECONNECT EXISTING 4" SANITARY

SERVICE FROM REST & WASH HOUSE

WITH NEW FITTINGS (SEE NOTE 3)

B

13 RESTROOM TRAILER, TEMPORARY

05 SEWER CLEANOUT CU-201

CU-102

4 " SCH 40 PVC WATER LINE TO TEMP.

3 " REDUCED PRESSURE BACKFLOW PREVENTER

IN HEATED ENCLOSURE (WATTS 009M3-QT &

14 WATTS BOX WB-1 OR APPROVED EQUALS)

B

(SEE NOTE 7)

NEW 500 GALLON FUEL STORAGE TANK.

09 (SEE SPEC SECTION 23 11 13)

12 (SEE NOTE 7 & 8)

NOTES

B-2

1.

ALL WORK ON SEPTIC SYSTEM SHALL BE A PERFORMED CERTIFIED ONSITE SEWAGE SYSTEM

INSTALLER, LICENSED IN THE STATE OF KENTUCKY.

2.

DEWATER AND CLEAN EXISTING SEPTIC TANK. DAMAGED OR BROKEN BAFFLES SHALL BE REMOVED AND REPLACEMENTS CUSTOM-FABRICATED FROM FIBER REINFORCED POLYMER (FRP) OR PVC. ALL SOLID AND LIQUID WASTE SHALL BE TRANSPORTED OFFSITE AND LEGALLY DISPOSED OF.

3.

PRIOR TO CONSTRUCTION, VERIFY LOCATION OF ALL EXISTING SANITARY CONNECTIONS TO SEPTIC TANK AND UTILITIES ADJACENT PIPE TO BE REPLACED. CONFIGURATION MAY VARY FROM THAT SHOWN, RECONNECT EXISTING UTILITIES AND RESTORE SERVICE AT NO ADDITIONAL COST TO THE GOVERNMENT.

4.

SANITARY PIPE DEPTH ESTIMATED AND SHOWN. LOCATE, UNCOVER, PROTECT, AND ACCOMODATE EXISTING UTILITIES DURING REPLACEMENT.

5.

SUBMIT VIDEO AND RECOMMENDED POINT REPAIR LOCATIONS FOR APPROVAL. BASIS OF BID SHALL BE 60 LF OF LATERAL DRAIN PIPE, AT 12 INDIVIDUAL EXCAVATIONS.

6.

AT COLLAPSED LATERAL DRAINS, RECOMMENCE CCTV INVESTIGATION AFTER REPAIR, AT NO

ADDITIONAL COST TO THE GOVERNMENT.

7.

INSTALL 3 4" BFP & ENCLOSURE ON 4" TEMPORARY CONCRETE PAD. BFP, ENCLOSURE & TEMPORARY PAD TO REMAIN FOR DURATION OF CONSTRUCTION. REMOVE BFP, DEMOLISH 4" CONCRETE PAD,

CUT AND CAP 3 4" WATER LINE AT SADDLE, AND REMOVE BURIED PVC SERVICE LINE AFTER

The beginning of the document. Download the full file to read on.