Chapter 42: Subcontractor Safety
Injury and Illness Prevention Plan
Acknowledgement Form
ENVIRONMENT, SAFETY & HEALTH DIVISION
Product ID: 509 | Revision ID: 2865 | Date Published: 27 May 2026 | Date Effective: 27 May 2026 URL: https://www-esh.slac.stanford.edu/eshmanual/references/subcontractorFormIIPP.pdf
This form is used for documenting subcontractor acknowledgement of injury and illness prevention program requirements and capturing occupational medicine information. The form is required for both green and non-green work. Procurement maintains the completed form for the awarded subcontractor. (See Subcontractor Safety: Green Work Procedure [SLAC-I-730-0A21C-025] and Subcontractor Safety: Non-green Work Procedure
[SLAC-I-730-0A21C-024].)
1.
Prime subcontractors must flow these requirements down to sub-tier subcontractors they hire.
2.
All subcontractors, prime and sub-tier, must complete a separate form.
3.
The form must be completed by an authorized representative of the subcontractor, preferably the supervisor / foreman for the job.
4.
Submission of this completed form with the proposal is a prerequisite for issuance of the notice to proceed.
Project name
Superintendent / foreman
Name
Point of contact
Name
AF
T
Company name
Phone
Phone
1 Injury and Illness Prevention Program Compliance
While their workers are physically located at SLAC, subcontractors to SLAC must comply with the requirements of the Department of Energy (DOE) Worker Safety and Health Program (10 CFR 851). These requirements are more stringent in some areas than Cal/OSHA IIPP requirements (8 CCR 1509 and 8 CCR 3203). (See Subcontractor Safety: Additional IIPP Requirements [SLAC-I-730-0A21S-062] for the differences.)
R
Subcontractors have the option to adopt SLAC’s 851-compliant IIPP or to submit their own 851-compliant IIPP to SLAC for review and approval. This information is provided only as a guide: it is your responsibility to ensure you have read and understood the regulatory requirements. I certify that that I have read the requirements of the SLAC IIPP and attest that
D
Our work on this subcontract will comply with the requirements of the SLAC IIPP, or We have developed an IIPP that is as protective as the SLAC IIPP (attach) Prepared by (foreman / supervisor for the job if possible) Name
Signature
Date
2 Occupational Medicine
Will you have any employees who will work on site at SLAC for 30, 8-hour days in a 12-month period, or who are enrolled for any length of time in a medical or exposure monitoring program required by federal, state, or local regulations (for example, hearing conservation, respiratory protection,
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8