Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
Updated
A PDF document (2.1 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf
The full file is for paid members, or buy this bid alone.
Preview
AF
T
CUIR Subproject 1 Power Outages and Linac
Downtime Plan
Critical Utilities Infrastructure Revitalization (CUIR)
D
R
Project # 20-SC-79
at
SLAC National Accelerator Laboratory
CUIR-WPC-0114
CUIR Plans and Procedures
Document Title: CUIR Subproject 1 Power
Outages and Linac Downtime
Plan
Document Number: CUIR-WPC-0114
Document Approval:
Originator: Lori Shewchuk – CUIR Power Outage and Downtime Planning Advisor • Content/Format • SME Input • Actionable
Reviewer: Kelsy Westendorf – CUIR Subproject 1 Manager
• Scope Alignment • Facts • Details • Schedule •Subcontractor Coordination Reviewer: Victor Longa – F&O Electrical Operations Subject Matter Expert • Facts • Details • Concepts • Standards • Best Practices Reviewer: Boris Ilinets – F&O Electrical Engineering Subject Matter Expert
AF
T
• Facts • Details • Concepts • Standards • Best Practices Reviewer: Amy Ancheta – CUIR Design Manager
• Mission Alignment • Facts • Details • Concepts • Standards • Best Practices
Reviewer: Tim Carnes, on behalf of JER Honeycutt – CUIR Construction Manager Subcontractor Coordination Standards • Best Practices
Reviewer: Oliver Lopez – Deputy Chief Operating Officer
R
• Alignment with LDT Power Outage Schedule • Verify F&O Managed System and Building Impacts Reviewer: Sharon Vetter – Project Downtime/Outage Scheduler
D
• Alignment with Accelerator Downtime Schedules • Verify Impacts to Accelerator Operations Reviewer: Tracy Ng – CUIR Project Manager
• Clarity • Reference • Scope Alignment • Schedule Alignment Approver: Janet Kan – CUIR Project Director
• Final Authorization
The only official copy of this file is located in the CUIR Controlled Document Site. Before using a printed/electronic copy, verify that it is the most current version.
CUIR Plans and Procedures
Document Title: CUIR Subproject 1 Power
Outages and Linac Downtime
Plan
Document Number: CUIR-WPC-0114
Document Informed Date: August 4, 2025 (Revision 2)
Mike Dunne – ALD LCLS Directorate
John Schmerge – ALD Accelerator Directorate
Ian Evans – Director, Environment, Safety, & Health (ES&H) Paul McIntyre – ALD SSRL
Al Owens – Research Technical Manager, AD LFD Acc Area Management Alayna Albert – CUIR QA Manager
Mark Hogan – Director, FACET-II
Brendan Curran – Director, Facilities & Operations
AF
T
John Hogan – LCLS-II-HE Project Director
Martina Martinello – CRMF Project Director
Anuneet Krishna – Chief Electrical Engineer, F&O
Revision History
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8
- Draft B2 03.13 Certificate of Conformity