Declaration of Conformity
2RGA031447
according to IEEE Standards
UL File # E143324
Apparatus:
Medium Voltage, Metal-clad, Air Insulated switchgear type SafeGear
Identification:
SafeGear 15kV, 3000A, 50kA, Type 2B, 30Cycle
Ratings:
Rated voltage:
Rated lightning impulse withstand voltage:
Rated power-frequency withstand voltage:
Rated frequency:
Rated normal current (busbar):
Rated normal current (breaker):
Rated peak withstand current:
Rated short time withstand current:
Rated duration of short-circuit:
Accessibility Type
Internal arc duration
3000
3000
2B
0.5
kV
kV
kV
Hz
A
A
kA
kA
s
sec
The assigned reports document type tests, which were carried out according to the below mentioned standards:
Type tests
Test according to
Test reports
No. / Date
Issued by
K3421-98I-2021/2021
LAPEM Irapuato, Gto.
IEEE C37.20.2-2015
Subclause: 6.2.1.1
IEEE C37.20.2-2015
Subclause: 6.2.1.2
Test for bus-bar
Insulation, bus joint
Insulation, and bus tap
Insulation
Continuous current
IEEE C37.20.2-2015
Subclause: 6.2.1.3
K3421-98F-2021 /2021
IEEE C37.20.2 -2015
Subclause: 6.2.2
IEEE C37.20.2-2015
Subclause: 6.2.3.1
CC-20180406-LMA/2018 ABB Inc. Lake Mary, FL.
K3422-046A-2021/2021,
K3421-98H-2021/2021.
LAPEM Irapuato, Gto.
IEEE C37.20.2 - 2015
Subclause: 6.2.3.2
K3422-046B-2021/2021,
K3421-98G-2021/2021.
LAPEM Irapuato, Gto.
IEEE C37.20.2 - 2015
Subclause: 6.2.4.1
K3422-046A-2021/2021
K3421-98H-2021/2021
LAPEM Irapuato, Gto.
IEEE C37.20.2 - 2015
Subclause: 6.2.4.2
IEEE C37.20.2 – 2015,
Subclause: 6.2.6
Tests for Insulating
IEEE C37.20.2 – 2015,
materials
Subclause: 6.2.7
Coating qualification tests IEEE C37.20.2 – 2015,
Subclause: 6.2.8
Internal arc test
IEEE C37.20.7 – 2007,
Section 5-6
K3422-046B-2021/2021
K3421-98G-2021/ 2021
ME-20161031-LM-A/
2016
2RGA030877 / 2021
LAPEM Irapuato, Gto.
2RGA030879 / 2021
ABB S.L.P, Mexico
17126-B1 / 2017
17126-B3 / 2017
17180-B /2017
18122-B /2018
KEMA Chalfont, PA
AF
D
Short time withstand
current on primary bus
and connections:
Short time withstand
current on Ground bus:
Mechanical Endurance
BIL-20141120-LMA/2014 ABB Inc. Lake Mary, FL.
R
Momentary withstand
current on primary bus
and connections
Momentary withstand
current on Ground bus
T
Power frequency
withstand voltage test:
Lightning Impulse
withstand voltage test:
LAPEM Irapuato, Gto.
ABB Inc. Lake Mary, FL.
ABB S.L.P, Mexico
KEMA Laboratories Chalfont is accredited according to DIN EN ISO/IEC 17025.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8