CUIR’s Quality Assurance Requirements for
Subcontractors & Suppliers
Critical Utilities Infrastructure Revitalization (CUIR)
D
R
Project # 20-SC-79
at
SLAC National Accelerator Laboratory
CUIR-QA-0175
CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175
Document Approval:
Originator: Alayna Albert – Quality Assurance Manager
• General QA Provisions • Compliance with DOE O 414.1E
Approver: Larry Ge – Deputy Director of Quality Assurance • Final QA Authorization
Approver: Tracy Ng – CUIR Project Manager
• Final Authorization
Informed on July 7, 2025
Revision History
Date Released
R0
August 27, 2025
Description of Change
Original Release.
D
R
Revision
AF
T
Janet Kan – CUIR Project Director
The only official copy of this file is located in the CUIR Controlled Document Site. Before using a printed/electronic copy, verify that it is the most current version.
CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175
3.1
3.2
3.3
D
R
AF
T
The only official copy of this file is located in the CUIR Controlled Document Site. Before using a printed/electronic copy, verify that it is the most current version.
CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175
Purpose
The Critical Utilities Infrastructure Revitalization (CUIR) project at SLAC National Accelerator Laboratory (SLAC) incorporates a graded approach to procurement actions at a level of rigor commensurate with the risk associated with the intended use or application of the procured item. To meet project quality requirements, the subcontractor shall adhere to the quality requirements outlined in the statement of work (SOW).
Scope
This document provides descriptions of each of the quality clauses included on the subcontractor SOW.
Responsibilities
3.1
Project Manager
3.2
Design Manager
AF
T
The Project Manager (PM) or designee shall be responsible for ensuring a copy of CUIR-QA-0175 Appendix C is provided to the supplier/subcontractor. The PM will ensure that all relevant project requirements are appropriately selected.
The Design Manager (DM) will ensure that all technical design and construction requirements are appropriately selected.
3.3
Quality Assurance Manager
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8
- Draft B2 03.13 Certificate of Conformity