Draft B2 03.05 CUIR's Quality Requirements for Subcontractors

Updated

A PDF document (1.3 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).

File name: DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

AF
T

CUIR’s Quality Assurance Requirements for
Subcontractors & Suppliers
Critical Utilities Infrastructure Revitalization (CUIR)

D

R

Project # 20-SC-79
at
SLAC National Accelerator Laboratory

CUIR-QA-0175

CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175

Document Approval:
Originator: Alayna Albert – Quality Assurance Manager
• General QA Provisions • Compliance with DOE O 414.1E
Approver: Larry Ge – Deputy Director of Quality Assurance • Final QA Authorization
Approver: Tracy Ng – CUIR Project Manager
• Final Authorization

Informed on July 7, 2025

Revision History
Date Released

R0

August 27, 2025

Description of Change
Original Release.

D

R

Revision

AF
T

Janet Kan – CUIR Project Director

The only official copy of this file is located in the CUIR Controlled Document Site. Before using a printed/electronic copy, verify that it is the most current version.

CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175

3.1
3.2

3.3

D

R

AF
T

The only official copy of this file is located in the CUIR Controlled Document Site. Before using a printed/electronic copy, verify that it is the most current version.

CUIR Quality Assurance Procedure Document
Document Title: CUIR’s Quality Clause
Descriptions for Subcontractors & Suppliers
Document Number: CUIR-QA-0175

Purpose

The Critical Utilities Infrastructure Revitalization (CUIR) project at SLAC National Accelerator Laboratory (SLAC) incorporates a graded approach to procurement actions at a level of rigor commensurate with the risk associated with the intended use or application of the procured item. To meet project quality requirements, the subcontractor shall adhere to the quality requirements outlined in the statement of work (SOW).

Scope

This document provides descriptions of each of the quality clauses included on the subcontractor SOW.

Responsibilities

3.1

Project Manager

3.2

Design Manager

AF
T

The Project Manager (PM) or designee shall be responsible for ensuring a copy of CUIR-QA-0175 Appendix C is provided to the supplier/subcontractor. The PM will ensure that all relevant project requirements are appropriately selected.

The Design Manager (DM) will ensure that all technical design and construction requirements are appropriately selected.
3.3

Quality Assurance Manager