Statement of Work for
Master Substation Annex Construction

AF
T

For the
Critical Utilities Infrastructure Revitalization (CUIR) Subproject 1 – Critical Electrical System Improvements

D

R

Project # 20-SC-79
at
SLAC National Accelerator Laboratory

October 2026

CUIR-SW-0203

CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203

Document Approval:
Originator: Jase Perez – CUIR Project Manager
• Content • Project Scope • General Requirements • Schedule • Facts Reviewer: Kelsy Westendorf – CUIR Subproject 1 Manager
• Complete/Accurate • Scope Alignment •Adherence to Project Specifications Reviewer: Amy Ancheta – CUIR Design Manager
• Project Scope • Technical Requirements
Reviewer: Keith Jobe – SLAC Electrical Safety Officer

AF
T

• Electrical Systems Safety • Lockout Tagout

Reviewer: Chris Mendez – CUIR Quality Assurance Manager (QAM) • General QA Provisions

Reviewer: Greg Johnson – CUIR ES&H Coordinator
• General ES&H requirements

Approver: Tracy Ng – CUIR Project Director

D

R

• Final Authorization

Informed Date: October 12, 2026

Brendan Curran – SLAC Facilities and Operations Director Ted Price – Systems Engineering Manager
J.E.R. Honeycutt – CUIR Construction Manager
Diego Regalado Baez – MSS Building Manager

Revision History
Revision
R0

Date Released

Description of Change

TBD

Original Release.

CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203

AF
T

R

D

CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203

8 Acronyms 23

D

R

AF
T

CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203

1 CUIR Project Overview

1.1 Overview of the Critical Utilities Infrastructure Revitalization (CUIR) Project Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for scientific research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) project is to modernize the utility infrastructure to ensure reliable utilities for the laboratory and its accelerators.

2 Project Scope

AF
T

CUIR is directly funded by the DOE's Office of Science. The project is organized into three subprojects