Draft B2 03.01 Statement of Work
Updated
A PDF document (1.2 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work for
Master Substation Annex Construction
AF
T
For the
Critical Utilities Infrastructure Revitalization (CUIR) Subproject 1 – Critical Electrical System Improvements
D
R
Project # 20-SC-79
at
SLAC National Accelerator Laboratory
October 2026
CUIR-SW-0203
CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203
Document Approval:
Originator: Jase Perez – CUIR Project Manager
• Content • Project Scope • General Requirements • Schedule • Facts Reviewer: Kelsy Westendorf – CUIR Subproject 1 Manager
• Complete/Accurate • Scope Alignment •Adherence to Project Specifications Reviewer: Amy Ancheta – CUIR Design Manager
• Project Scope • Technical Requirements
Reviewer: Keith Jobe – SLAC Electrical Safety Officer
AF
T
• Electrical Systems Safety • Lockout Tagout
Reviewer: Chris Mendez – CUIR Quality Assurance Manager (QAM) • General QA Provisions
Reviewer: Greg Johnson – CUIR ES&H Coordinator
• General ES&H requirements
Approver: Tracy Ng – CUIR Project Director
D
R
• Final Authorization
Informed Date: October 12, 2026
Brendan Curran – SLAC Facilities and Operations Director Ted Price – Systems Engineering Manager
J.E.R. Honeycutt – CUIR Construction Manager
Diego Regalado Baez – MSS Building Manager
Revision History
Revision
R0
Date Released
Description of Change
TBD
Original Release.
CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203
AF
T
R
D
CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203
8 Acronyms 23
D
R
AF
T
CUIR Statement of Work
Document Title: CUIR SOW for Master Substation
Annex (B017S) Construction
Document Number: CUIR-SW-0203
1 CUIR Project Overview
1.1 Overview of the Critical Utilities Infrastructure Revitalization (CUIR) Project Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for scientific research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) project is to modernize the utility infrastructure to ensure reliable utilities for the laboratory and its accelerators.
2 Project Scope
AF
T
CUIR is directly funded by the DOE's Office of Science. The project is organized into three subprojects
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8
- Draft B2 03.13 Certificate of Conformity