Draft B2 03.03 Commissioning Plan
Updated
A PDF document (1.0 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_03.03_Commissioning_Plan.pdf
The full file is for paid members, or buy this bid alone.
Preview
AF
T
Commissioning Plan
D
R
SLAC National Accelerator Laboratory
CUIR Master Substation Expansion
BMcD Project No. 163236
Revision: Draft
September 25, 2026
prepared for
SLAC National Accelerator Laboratory
AF
T
CUIR Master Substation Expansion
D
R
Revision: 0
09/25/2026
prepared by
Burns & McDonnell Engineering Company, Inc.
Walnut Creek, CA
COPYRIGHT © 2026 BURNS & McDONNELL ENGINEERING COMPANY, INC.
Commissioning Plan
Revision Design Phase Draft
Page No.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2.0
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.3
2.3.1
3.0
3.1
D
R
AF
T
1.0
APPENDIX A – CX TEAM
APPENDIX B - ROLES AND RESPONSIBILITIES
APPENDIX C – EQUIPMENT TO BE COMMISSIONED
APPENDIX D – PREFUNCTIONAL CHECKLISTS
APPENDIX E – FUNCTIONAL TESTS
i
Commissioning Plan
Overview
LIST OF ABBREVIATIONS
Term / Phrase / Name
AHJ
Authority Having Jurisdiction
ASHRAE
American Society of Heating, Refrigeration, Air-Conditioning Engineers
BMcD
Burns & McDonnell
CUP
Central Utility Plant
Cx
Commissioning
CxA
Commissioning Authority
CxC
Subcontractor’s Commissioning Coordinator
CMAR
Construction Manager At-Risk
CUIR
Critical Utilities Infrastructure Revitalization
DOR
Designer of Record
EC
Electrical Subcontractor
FAC
Fire Alarm Subcontractor
F&O
Facilities and Operations
FPC
Fire Protection Subcontractor
FPT
Functional Test Procedure
HVAC
Heating, Ventilation, and Air Conditioning
O&M
OR
PFT
PMT
R
OAC
Mechanical Subcontractor
Owner, Architect/Engineer, and Subcontractor
Operations & Maintenance Manuals
D
MC
AF
T
Abbreviation
Owner
Pre-Functional Test
SLAC Project Management Team
PR
Owner’s Project Requirements
TAB
Testing, Adjusting and Balancing
TC
Temperature Controls Subcontractor
UPS
Uninterruptable Power Supply
i
Commissioning Plan
Overview
1.0
OVERVIEW
The purpose of this Commissioning Plan is to provide details/structure related to the implementation of the commissioning process. This plan describes commissioning protocols and activities that shall occur throughout the design, construction, acceptance, occupancy, and warranty phases. This is a transient or “live” document that will be updated by the Commissioning Authority (Burns and McDonnell) throughout the project; updates will be provided to the Commissioning Team for review and comment prior to edits being noted as final.
1.1
Introduction to the Commissioning Process
Commissioning is a quality focused process for enhancing the delivery of a project. The process focuses
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8
- Draft B2 03.13 Certificate of Conformity