Draft B2 03.03 Commissioning Plan

Updated

A PDF document (1.0 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).

File name: DRAFT_B2_03.03_Commissioning_Plan.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

AF
T

Commissioning Plan

D

R

SLAC National Accelerator Laboratory

CUIR Master Substation Expansion
BMcD Project No. 163236
Revision: Draft
September 25, 2026

prepared for

SLAC National Accelerator Laboratory

AF
T

CUIR Master Substation Expansion

D

R

Revision: 0
09/25/2026

prepared by

Burns & McDonnell Engineering Company, Inc.
Walnut Creek, CA
COPYRIGHT © 2026 BURNS & McDONNELL ENGINEERING COMPANY, INC.

Commissioning Plan

Revision Design Phase Draft

Page No.

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8

2.0

2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.3
2.3.1

3.0

3.1

D

R

AF
T

1.0

APPENDIX A – CX TEAM

APPENDIX B - ROLES AND RESPONSIBILITIES

APPENDIX C – EQUIPMENT TO BE COMMISSIONED

APPENDIX D – PREFUNCTIONAL CHECKLISTS

APPENDIX E – FUNCTIONAL TESTS

i

Commissioning Plan

Overview

LIST OF ABBREVIATIONS

Term / Phrase / Name

AHJ

Authority Having Jurisdiction

ASHRAE

American Society of Heating, Refrigeration, Air-Conditioning Engineers

BMcD

Burns & McDonnell

CUP

Central Utility Plant

Cx

Commissioning

CxA

Commissioning Authority

CxC

Subcontractor’s Commissioning Coordinator

CMAR

Construction Manager At-Risk

CUIR

Critical Utilities Infrastructure Revitalization

DOR

Designer of Record

EC

Electrical Subcontractor

FAC

Fire Alarm Subcontractor

F&O

Facilities and Operations

FPC

Fire Protection Subcontractor

FPT

Functional Test Procedure

HVAC

Heating, Ventilation, and Air Conditioning

O&M
OR
PFT
PMT

R

OAC

Mechanical Subcontractor
Owner, Architect/Engineer, and Subcontractor
Operations & Maintenance Manuals

D

MC

AF
T

Abbreviation

Owner

Pre-Functional Test
SLAC Project Management Team

PR

Owner’s Project Requirements

TAB

Testing, Adjusting and Balancing

TC

Temperature Controls Subcontractor

UPS

Uninterruptable Power Supply

i

Commissioning Plan

Overview

1.0

OVERVIEW

The purpose of this Commissioning Plan is to provide details/structure related to the implementation of the commissioning process. This plan describes commissioning protocols and activities that shall occur throughout the design, construction, acceptance, occupancy, and warranty phases. This is a transient or “live” document that will be updated by the Commissioning Authority (Burns and McDonnell) throughout the project; updates will be provided to the Commissioning Team for review and comment prior to edits being noted as final.

1.1

Introduction to the Commissioning Process

Commissioning is a quality focused process for enhancing the delivery of a project. The process focuses