Home / SLAC CUIR SP1 Master Substation Annex Building Construction / Document

Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)

Updated

A PDF document (593 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).

File name: DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SUPPLY CHAIN MANAGEMENT

Section C – Statement of Work
Please refer to the following attached documents and all referenced applicable documents therein which are also attached to this Section:

D

R

AF
T

1. Statement of Work titled “CUIR SOW for Master Substation Annex (B017S) Construction” R0 Release Date TBD
2. Drawings titled “SLAC B017S Master Substation Annex” Rev A8 dated September 5, 2025 3. Commissioning Plan Rev 0 dated September 25, 2026
4. Document titled “CUIR Subproject 1 Power Outages and Linac Downtime Plan” R2 dated September 5, 2025
5. Quality Assurance Procedure titled “CUIR’s Quality Clause Descriptions for Subcontractors & Suppliers” R0 dated August 27, 2025
6. Department of Energy (DOE) Order 414.1E titled “Quality Assurance” dated December 18, 2024 7. Drawing titled “SLAC 230kV Service Upgrade 230kV Bus Work General Arrangment” dated September 18, 1998 with file name RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026 8. Appendix I: Technical Data Submittal titled “Specification for SLAC Master Substation Medium Voltage Switchgear” dated May 19, 2023 and BIO stamped December 9, 2022 9. Document titled, “MV SWGR Shipping Preparation” Rev 6 dated April 17, 2023 10. As-Builts for Switchgears titled “Safegear Job Specification” Rev 3 dated February 8, 2024

11. Installation Operation and Maintenance Manuals

a. Manual titled “SafeGear 5/15 kV arc-resistant switchgear” Rev C dated October 2017 b. Technical and Application Guide titled “SafeGear HD 5/15 kV, 63 kA arc-resistant high duty switchgear” Rev D dated June 2023
c. Document titled, “What’s Shakin’? Seismic requirements and ABB compliance” Rev F dated January 2025
d. Manual titled “ADVAC™ 25÷50 kA Medium voltage vacuum circuit breaker” Rev E dated February 2025
e. Manual titled “Lifting eye Extension Installation & Crane Lifting” Rev 1 dated October 21, 2015
12. Certified Test Reports Rev 2 dated August 13, 2025
13. Document titled “Declaration of Conformity 2RGA031447” dated December 20, 2023 14. Warranty Certificate for ABB Safegear Switchgear dated August 20, 2025

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION C (REV. 6/01/12)

SLAC-SCM-GEN-030

The beginning of the document. Download the full file to read on.

Other documents in this bid