Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
Updated
A PDF document (745 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. Department of Energy
ORDER
Washington, DC
DOE O 414.1E
Approved: 12-18-2024
SUBJECT: QUALITY ASSURANCE
1.
PURPOSE. To establish an integrated Quality Assurance Program (QAP) that assures: a.
controls for the conduct of work,
b.
requirements are met, and;
c.
achievement of organizational mission needs.
CANCELS/SUPERSEDES. DOE O 414.1D Chg. 2 (LtdChg), Quality Assurance, dated 9-15-20. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual or regulatory obligation to comply with the directive. Contractor Requirements Documents (CRDs) that have been incorporated into a contract remain in effect throughout the term of the contract unless and until the contract or regulatory commitment is modified to either eliminate requirements that are no longer applicable or substitute a new set of requirements.
3.
APPLICABILITY.
Departmental Applicability. Except for the equivalencies and exemptions in paragraphs 3.c. and 3.d., this Order applies to all Departmental elements, and their associated field element. 1The Administrator of the National Nuclear Security Administration (NNSA) must ensure that NNSA employees comply with their responsibilities under this directive. Nothing in this directive will be construed to interfere with the NNSA Administrator’s authority under section 3212(d) of Public Law (P.L.) 106-65 to establish Administration-specific policies, unless disapproved by the Secretary.
D
R
a.
AF
T
2.
(2)
Except for the equivalencies and exemptions in paragraph 3.c., this Order applies to all work conducted by or for DOE.
(3)
Except for the equivalencies and exemptions in paragraph 3.c., applicable requirements of the CRD set forth in this Order apply to governmentowned government-operated (GOGO) facilities and federally staffed laboratories.
Operations offices, service centers, site offices, area offices, field offices, government-owned government-operated facilities, and regional offices of federally-staffed laboratories that report directly to a DOE Headquarters office.
AVAILABLE ONLINE AT:
www.directives.doe.gov
INITIATED BY:
Office of Environment, Health, Safety and Security
DOE O 414.1E
12-18-2024
DOE Contractors. Except for the equivalencies and exemptions in paragraph 3.c., the CRD sets forth requirements of this Order that will apply to contracts that include the CRD. Except for the equivalencies and exemptions in paragraph 3.c., this CRD must be included in contracts for the management or operation of DOEowned or -leased areas or locations or other areas or locations controlled by DOE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8
- Draft B2 03.13 Certificate of Conformity