Home / LBNF/DUNE-US South Dakota Scaffolding Services / Document

J-5 Exhibit A 7020 South Dakota Services

Updated

A PDF document (646 KB) attached to LBNF/DUNE-US South Dakota Scaffolding Services, from the Department of Energy. Due Nov 24, 2026, 4:00 PM (UTC-7).

File name: J-5 Exhibit_A_7020_South_Dakota_Services.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

EXHIBIT A - ES&H

Requirements
& Training

For Supply and/or Services
Subcontracts – South Dakota
Leased & Non-Leased Spaces
Title of Scope of Work: LBNF/DUNE-US Scaffolding Rental Services
The Subcontractor shall coordinate work schedules, site access, and resolution of technical issues with Point of Contact or Service / Installation Manager or Construction Coordinator: Name: Ivan Steiger
Phone

307-272-2254

Email:

[email protected]

Specific training, Personal Protective Equipment
(PPE) Requirements, and Exemptions
FFDG Provided Training:
LBNF/DUNE ES&H orientation training
o Surface (2.5-hours)
o Underground (1.5 hours)
o Piratical Factors (4-hours)
Underground Guide training (for supervisors) (4-hours). PPE Requirements provided by Subcontractor:
Type II Safety Helmet with chin strap, safety glasses,
class II reflective clothing,
construction boot with safety toe, and minimum
cut level IV gloves.
Underground work will require a cap lamp, Ocenco M-20.3 and Each guide/supervisor is required to carry a 4-gas monitor o 4-Gas Monitor, NO2, CO2, O2, and H2S

PPE Requirements provided by FFDG
-

Self-rescuer, Ocenco 7.5 Emergency Breathing Apparatus – for each individual access the underground space.

Subcontractor’s ES&H Program
In reference to Section 2.2, this subcontract will
require the Subcontractor to submit an ES&H Program.

Section 1 – Scope of Work & Coordination
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10

Point of Contact
Definitions
References
Enforcement
Subcontractor & ES&H Certificate
Concern Reporting Process
Bulletin Board
Subcontractor’s Competent Person
Work Completion and Clean-up
Experienced Modification Rate

Section 2 – Subcontractor’s ES&H Program
2.1
2.2
2.3
2.4
2.5

Responsibility
Environment, Safety, & Health
Hazard Analysis
Stop Work Activity
Off Hours / High Hazard Work

Section 3 – Reporting & Training
Requirements
3.1
3.2
3.3

Emergencies Response and Reporting
Subcontractor Safety & Health Records
Subcontractor Training

Section 4 – Work Site Conditions
4.1
4.2
4.3
4.4

Site Access
Permits
Electrical Power
Transportation of Equipment and
Materials

4.5 Access and Traffic Ways

4.6 Temporary Heat

4.7 Temporary Lighting and Ventilation

4.8 Water and Sanitation

4.9 Hazardous Material

4.10 Confined Work Space

4.11 Work on Existing Utilities

4.12 Personal Protective Equipment (PPE)

The beginning of the document. Download the full file to read on.

Other documents in this bid