Cross Reference Matrix
Category 3
Paragraph 5.2.1.3 Crossed out- with multiple trades of referenced paragraph Category 4
Paragraph 5.2.1.4
Crossed out- Note: each project submitted receives a point value of 100pts. All sections. Attachment 2c Appendix C MACC SB Self Scoring Matrix
Relevant Construction Experience:
Changed verbiage from “cannot be awarded prior to 1 May 2021 and at least 80% complete as of solicitation date” to “completed after 1 May 2021; or at least 80% complete as of solicitation date”. Category 1:
Adjusted point value
Changed “$5M - $10M” to “greater than $5M construction cost”. Category 3:
Removed verbiage “with multiple trades as defined in referenced paragraph”. Category 4:
Clarified “over $1M” to “greater than $1M construction cost”. Category 6:
Removed the word “licenses”, kept “Certifications”.
Attachment 2f Appendix C MACC FO Self Scoring Matrix
Relevant Construction Experience:
Changed verbiage from “cannot be awarded prior to 1 May 2021 and at least 80% complete as of solicitation date” to “completed after 1 May 2021; or at least 80% complete as of solicitation date”. Category 1:
Changed “over $10M” to “greater than $10M construction cost”. Category 3:
Removed verbiage “with multiple trades as defined in referenced paragraph”. Category 4:
Clarified “over $10M” to “greater than $10M construction cost”. Category 5:
Added verbiage “Ktr Executes Design and Construction”.
Added verbiage “to demonstrate”
Added verbiage “Design Analysis”
Category 6:
Removed Certifications for Credentialed Professionals
Statement of Work
Section 2.2 Contracting Officer’s Representative (COR)- Crossed out definition. Section 2.4 Project Manager- Updated
Section 2.5 Quality Assurance Construction Inspector (QACI)- Updated Section 3.1.2.1 Contract Program Manager- Crossed out-when there is an active task order. Section 3.1.2.2 Quality Control Manager (QCM)- crossed out (or Alternative) and Construction QA Inspector changed to QACI. Added additional paragraph- When the Contractor has multiple TO/projects sites, provide a separate full-time assistant QCM or QC Specialist (reference specification section 01 45 00) for each project site; the assistant/specialist may not serve as the Superintendent. A designated member of the QC organization shall be at each TO/project site at all times when work is being performed. Section 3.1.2.3 Site Safety and Health Officer (SHHO) added: meet the qualification requirements of a Level One or Two SSHO as, crossed out have the minimum qualifications. Added the sentence and U.S. Army Corps of Engineers (USACE) publication EM 385-1-1, Safety—Safety and Occupational health (SOH) Requirements.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6