(Reference Only) Attachment 1 Statement of Work r4
Updated
A Word document (234 KB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Nov 30, 2026, 1:00 PM (UTC-6).
File name: (Reference Only) Attachment 1 Statement of Work r4_25 Oct 26.docx
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work
Multiple Award Construction Contract for General Construction Services
Revision: 4
Tinker Air Force Base, Oklahoma
October 2026
Prepared By:
72 ABW Civil Engineering Directorate
7535 5th Street, Building 400
Tinker AFB, OK 73145
TOC \o "1-3" \h \z \u 1.DESCRIPTION OF WORK PAGEREF _Toc185253307 \h 1
1.1Background PAGEREF _Toc185253308 \h 1
1.2Program Description PAGEREF _Toc185253309 \h 1
1.3Classifications of Work PAGEREF _Toc185253310 \h 1
1.3.1Design-Build PAGEREF _Toc185253311 \h 1
1.3.2Construction w/Limited Design PAGEREF _Toc185253312 \h 2 1.3.3Construction Only PAGEREF _Toc185253313 \h 2
2.DEFINITIONS PAGEREF _Toc185253314 \h 3
2.1Contracting Officer (CO) PAGEREF _Toc185253315 \h 3
2.2Contracting Officer’s Representative (COR) PAGEREF _Toc185253316 \h 3 2.3Credentialed Professional PAGEREF _Toc185253317 \h 3
3.PERFORMANCE CAPABILITIES PAGEREF _Toc185253318 \h 3
3.1Contractor Personnel PAGEREF _Toc185253319 \h 4
3.1.1General Requirements PAGEREF _Toc185253320 \h 4
3.1.2Key Personnel PAGEREF _Toc185253321 \h 4
3.1.3Additional Positions PAGEREF _Toc185253322 \h 7
3.1.4Exceptions/Variances from Experience Requirements PAGEREF _Toc185253323 \h 8 3.1.5Organizational Chart PAGEREF _Toc185253324 \h 8
3.2Design/Drafting PAGEREF _Toc185253325 \h 8
3.3Subcontractors PAGEREF _Toc185253326 \h 9
4.QUALITY CONTROL PAGEREF _Toc185253327 \h 9
4.1Inspection System PAGEREF _Toc185253328 \h 9
4.2Deficiency Prevention PAGEREF _Toc185253329 \h 9
4.3Inspection Files PAGEREF _Toc185253330 \h 9
5.LOCAL OFFICE AND STAGING AREAS PAGEREF _Toc185253331 \h 9
5.1Local Office PAGEREF _Toc185253332 \h 9
5.2Storage/Staging Areas PAGEREF _Toc185253333 \h 9
6.START-UP PERIOD PAGEREF _Toc185253334 \h 10
7.DOCUMENT REQUIREMENTS PAGEREF _Toc185253335 \h 10
7.1DOCUMENT FORMAT PAGEREF _Toc185253336 \h 10
7.1.1Specifications/Reports/Material Submittals PAGEREF _Toc185253337 \h 10 7.1.2Drawings PAGEREF _Toc185253338 \h 10
7.2FILE NAMING CONVENTIONS PAGEREF _Toc185253339 \h 10
8.CORRESPONDENCE PAGEREF _Toc185253340 \h 11
9.COMMUNICATION PAGEREF _Toc185253341 \h 11
10.ORDERING PROCEDURES PAGEREF _Toc185253342 \h 12
10.1Fair Opportunity Proposal Request (FOPR) PAGEREF _Toc185253343 \h 12 10.2Project Documents PAGEREF _Toc185253344 \h 12
10.3Site Visit PAGEREF _Toc185253345 \h 12
10.4Contractor’s Proposal PAGEREF _Toc185253346 \h 13
10.4.1Proposal Package PAGEREF _Toc185253347 \h 13
10.4.2Cover Sheet PAGEREF _Toc185253348 \h 14
10.4.3Project Narrative PAGEREF _Toc185253349 \h 14
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6