TAFB Facility Standards
Updated
A PDF document (10.1 MB) attached to Tinker AFB 2026 Multiple Award Construction Contract (MACC), from the Department of the Air Force. Due Oct 28, 2026, 1:00 PM (UTC-5).
File name: TAFB Facility Standards.pdf
The full file is for paid members, or buy this bid alone.
Preview
TINKER AIR FORCE BASE
FACILITY STANDARD
2020 Edition
Base Civil Engineer 72 ABW/CE
th
7535 5 ST, Ste 101
Tinker Air Force Base, Oklahoma 73145-9010
Telephone 405-734-3451
Fax 405-734-5535
APPROVING OFFICIAL:
Stephanie Wilson
Base Civil Engineer
Civil Engineer Directorate, 72 ABW
Issued: AUG-2020
Part 1: Project Procedures
Chapter
Page
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
Introduction
Office of Primary Responsibility (OPR)
Application of the Standard
How to Use the Standard
TAFB 72 ABW/CE as the Authority-Having-Jurisdiction
BCE Project Submittal Requirements
BCE Function at TAFB
2.1
Order of Project Requirements
Construction Documents - Signed/Sealed requirements
Design Publications incorporated by reference to the Standard Model Building Codes and Construction Regulations
Occupational Safety and Health Act / OSHA Regulations
National Fire Protection Association
Accessibility
Sources of Technical and Procedural Requirements
Responsibilities of the Contractor
Variance from the Standard
4.1
4.2
Base Maps
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
General
Change Order Documentation
TINKER AFB FACILITY STANDARD
AUG-2020
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
CE Recordkeeping
Dual Records
Delivery Media
CADD File Formats
Documentation
Image Files
CADD File Formats
CADD Standards
Specifications Formatting
Base General Requirements TAFB
Additional Geographic Information Systems Data
Part 2: Base Infrastructure
Chapter
Page
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
Water Supply
Wastewater Treatment
Piping, Utilities, and Manholes
Sanitary Water Supply
Sanitary Sewer Collection Systems
Industrial Wastes
Oil Separators
Storm Drainage System
Natural Gas Delivery Systems
Liquid Fuel Supply Systems
7.1
7.2
7.3
7.4
7.5
Standard Facility signs
Zip + 4 Program Implementation
Logos and Super Graphics
Highway Standards and Traffic Control
Identification of Hazardous Storage
8.1
8.2
8.3
Traffic Considerations
Signage
Parking
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
Mandatory publications
Asbestos Containing Materials (ACM)
Lead-Based Paint
PCB Filled Ballast and Universal Waste Lamps
Historic Preservation
Aging Facilities
Base Historic Preservation Officer (BHPO)
State Historic Preservation Officer (SHPO)
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Contract Data Requirements List - Organization Chart Signed
- Contract Data Requirements List - Quaterly Progress Mtg Signed
- Contract Data Requirements List - TO Progress Mtg Signed
- Appendix A - Abbreviations
- Appendix B1 TAFB General Requirements Div 00-01
- Appendix C UMRL
- Attachment 1: Statement of Work Jun26
- Attachment 2b Appendix B Work Sample Cover Sheet4May26
- Attachment 3: Section M Evaluation Criteria
- TAFB Technical Requirements Div 02-48
- ERDCITL r2
- ERDCITL r6