TE-09e Fugitive Dust Control Form 05-Staging Areas

Updated

A PDF document (771 KB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).

File name: TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Dugway Proving Ground Fugitive Dust Control Plan Form 05 Storage, Hauling and Handling of Aggregate Material

Staging Areas

Activity Description: Areas where equipment, vehicles or materials are parked, stored or assembled before use during a project.

General Information
Location(s):

Start Date:

End Date:

Point of Contact:

Email:

Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques
Select at least one best management practice (BMP) for each critical mitigation area: Limit visible dust opacity from vehicular operations
BMP 05-01 Limit vehicle mileage and speed.
BMP 05-02 Apply water on all vehicle traffic areas in the staging areas and unpaved access routes. Stabilize staging areas soils during use
BMP 05-03 Pre-water and maintain surface soils in a stabilized condition. BMP 05-04 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical:

)

Stabilize staging area soils at project completion
BMP 05-05 Apply a chemical stabilizer. (Name of chemical:

)

BMP 05-06 Apply screened or washed aggregate.
BMP 05-07 Use wind breaks.
BMP 05-08 Pave.
BMP 05-09 Completed project will cover staging area with buildings, paving and/or landscaping. BMP 05-10 Apply water to form adequate crust and prevent access.

Logbook Requirement

If suppression is used, a logbook is required, at minimum, it must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention

In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly. *By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature

Date

This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: [email protected]