SUPPLY CHAIN MANAGEMENT

NOTICE TO PROCEED SUBMITTALS

Project:
PO#:
Subcontractor:

SLAC PM:

SLAC CM:

NOTICE TO PROCEED CHECKLIST

Approved insurance certificates

AF
T

Performance & Payment Bonds. Penal sum of Bonds must be equal to the FFP Award for Subcontracts of $35,000 and over.

Subcontracts of $25,000 and over requiring design by Subcontractor: Professional Errors and Omissions Insurance in the amount not less than $1,000,000 per claim.

Subcontracts of $50,000 and over: Subcontractor shall purchase and maintain at its cost Builder’s All Risk Insurance covering physical damage to the work being performed under this Subcontract in a form acceptable to the University and to the full value of the work at the time of loss or damage.

R

"Statement and Acknowledgment” Standard Form (SF1413) for all known Sub-Subcontractors.

D

A copy of the Subcontractor’s licenses and permits, and copies of all known Sub-Subcontractors licenses or permits, if needed, in performance of the Subcontract.

Issue for Construction Set (IFC) Drawings and Specifications. Project schedule in the specified format as required by the SLAC PM