Draft B2 09.1 Reps and Certs Supplement
Updated
A PDF document (537 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf
The full file is for paid members, or buy this bid alone.
Preview
SUPPLY CHAIN MANAGEMENT
Representations and Certifications Supplement
Stanford University has executed and is engaged in the performance of Prime Contract DE-AC02-76SF00515 with the United States Department of Energy (DOE), for the management and operation of SLAC National Accelerator Laboratory in Menlo Park, CA. The following representations and certifications must be completed, and this form must be signed and returned with the Offeror’s proposal.
BUSINESS INFORMATION
Business Name:
Business Address:
“Doing Business As” (DBA):
Unique Entity Identifier (UEI):
Tax Identification Number (TIN):
AF
T
Duns and Bradstreet Number (DUNS):
SYSTEM FOR AWARD MANAGEMENT (SAM) ELECTRONIC REPRESENTATION AND CERTIFICATION APPLICATIONS: The Offeror certifies that the annual Representations and Certifications available electronically via the System for Award Management (SAM) have been completed and by submission of this offer, the Offeror further certifies that the information contained therein is current, accurate, complete, and fully responsive to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer. Those Representations and Certifications are incorporated in this offer by reference (see FAR 4.1201).
EMPLOYMENT VERIFICATION ELIGIBILITY (E-VERIFY)
Offeror represents that:
R
(Applicable to proposals exceeding $3,500)
E-Verify is not applicable based on paragraph (e) of FAR 52.222-54 Employment Eligibility Verification. is not currently enrolled in E-Verify
D
it is
if not currently enrolled, it will enroll in E-Verify with 30 calendar days of subcontract award. It will include FAR 52.222-54 in applicable lower-tier subcontracts.
EMPLOYEE-VENDOR RELATIONSHIP CERTIFICATION
An affirmative response in the following certification will require the University to evaluate your offer to determine whether a conflict of interest exists. A determination that a conflict of interest exist may necessitate rejection of your offer. The fact that an employee or former employee of Stanford University, or near relative of an employee owns, controls, or has a significant financial interest in your organization will not, in and of itself, necessarily be cause for rejection of your offer.
DEFINITIONS
Employee: Any individual who is presently employed by any entity of Stanford University, including the Stanford Linear Accelerator Center. Former Employee: An individual who has retired or separated from Stanford University, was dismissed, or was otherwise
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8