Bowling VA Combined Test Report 2023
Updated
A PDF document (13.1 MB) attached to LEX Triannual Energy Study and ARC Flash Testing, from the Department of Veterans Affairs. Due Nov 30, 2027, 11:00 AM (UTC-6).
File name: Bowling VA Combined Test Report 2023.pdf
The full file is for paid members, or buy this bid alone.
Preview
Electrical Maintenance & Testing Project
Contract No. VA36C24923P0897
Contracting Officer: Lara Hampton
Phone No: (615)225-5414
Veterans Affairs Medical Center
Bowling Division
Lexington, Kentucky
Project Test Report
November 2023 – February 2024
Submitted by
Jerry M. Parks Jr., Project Manager
William
Henderson
LLC
4041 Greenfern Drive
Lockhart, Florida 32810
(407)427-0436
in cooperation with
305 Wendy Hill Road
Savannah, Georgia 31410
(803)760-3138
Cover
Electrical Maintenance and Testing Project
Contract No. VA36C24923P0897
Veterans Affairs Medical Center – Bowling Division
Lexington, Kentucky
November 2023 – February 2024
Section 1
Electrical Testing and Maintenance Summary
Section 2
Publications/Exhibits
Section 3
Electrical Test Records
Section 4
Individual Thermographic Report
Section 5
Specialized Tools & Equipment, Testing Specifications
and Licenses/Certifications (Digital Version Only)
William Henderson
LLC
in cooperation with
Electrical Testing & Maintenance
Report Summary
General
Williiam Henderson LLC, in cooperation with SDV Services Inc., provided electrical testing and maintenance services at the Veterans Affairs Medical Center – Bowling Division in Lexington, Kentucky on November 2023 to February 2024 under contract number 36C2493P0897. All services were conducted in accordance with contract specifications, industry standards, NFPA 70B and manufacturer’s recommendations.
This report consists of the following:
Section 1
Electrical Testing and Maintenance Report Summary
Section 2
Publications/Exhibits
Section 3
Electrical Test Records
Section 4
Individual Thermographic Test Records
Section 5
Licenses, Certificates, Specialized Tools & Equipment
The types of equipment tested during this testing session included: Medium Voltage Circuit Breakers
Medium Voltage Switches
Medium Voltage Network Protectors
Medium Voltage Oil- and Dry-Type Transformers
Low Voltage Switchboards and Circuit Breakers (select areas) Automatic Transfer Switches
Motor Control Centers
Electrical Panels
Test results were compared with manufacturer’s recommendations for each specific equipment item and type.
1|P a g e
Thermographic Inspection (Infrared)
In addition to regular testing procedures, infrared scan procedures were used wherever possible to determine serviceability and reliability of the equipment inspected to include panelboards. The infrared services were conducted using a FLIR T440 thermal imaging camera.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Bid document
- Bid document
- Bowling B MV One Line
- Bowling Combined Arc Flash Project - Volume 2 Data Files
- Bowling Electrical Main Hospital One Line
- Bowling Electrical Risers
- Bowling ONE-LINE E-602-1
- Bowling Tests Summary
- Bowling Tower Gen 1 2 One Line
- Bowling Tower SWB SBA SBC SBD SBE SBH One Line
- Bowling Tower SWB SBB SBF SBG One Line