Draft B2 03.10 As-Built SWGR9 SWGR8
Updated
A PDF document (13.0 MB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf
The full file is for paid members, or buy this bid alone.
Preview
SAFEGEAR JOB SPECIFICATION
Drawing No:
Status:
1VAL314911A0000
RELEASED
Shop Order No.:
Line Item No.:
Serial No.:
Engineer:
AAM
Date:
2/8/24
Approved:
ESV
Date:
2/8/24
Cust P.O.:
1173
Rev:
CS03149
A01
1VALCS03149A01
The information contained in this document
has to be kept strictly confidential.
Any unauthorized use, reproduction,
distribution or disclosure to third parties is
strictly forbidden. ABB reserves all rights
regarding Intellectual Property Rights.
© Copyright 2023 ABB.
All rights reserved.
GENERAL INFORMATION
Rev.
Sold To: FGC CONSTRUCTION LLC
4916 E BROADWAY
MADISON, WI 53716
UL Label: X
For: SLAC NATIONAL ACCELERATOR LAB
2575 SAND HILL ROAD M/S 1
MENLO PARK, CA 94025
IBC Cert:
Nuclear Cert:
AF
T
CSA 22.2, no. 31 Certification with cUL Label
Product Type: SafeGear IEEE Type 2B
A/R Arc Duration Time: 10 Cycle
Rated Voltage: 15kV
System Voltage: 12.47kV
Main Bus Rating: 3000 A
kA Rating: 50kA
R
System Source Type: 3 Phase Wye - Solid Ground
Freq: 60 Hz
D
Construction: Indoor Gasketed Doors/Filters
Environmental: Rodent proof
Seismic Reinforced: CBC 2019
Ip=1.0
Paint Finish: ANSI 61-light gray exterior galvalum interior Special Color:
Undercoating:
Mimic Bus: None
Cert Prod Test Reports:
Swgr
Breakers
CT's
PT's
X
X
X
X
Cert of Conformance:
Customer Visit:
Inspection
Test
Sheet 1 of 4
SAFEGEAR JOB SPECIFICATION
Drawing No:
Status:
1VAL314911A0000
RELEASED
Shop Order No.:
Line Item No.:
Serial No.:
Engineer:
AAM
Date:
2/8/24
Approved:
ESV
Date:
2/8/24
Cust P.O.:
1173
Rev:
CS03149
A01
1VALCS03149A01
The information contained in this document
has to be kept strictly confidential.
Any unauthorized use, reproduction,
distribution or disclosure to third parties is
strictly forbidden. ABB reserves all rights
regarding Intellectual Property Rights.
© Copyright 2023 ABB.
All rights reserved.
MECHANICAL INFORMATION
Rev.
Frame Construction
Match & Line:
Ref. S.O.
Frame Depth: 92 inches
Plenum Required: External Strapping
Bkr Pri Bushing: Epoxy
AF
T
Enclosure Vent: Screened Louvers (Rodent Proof)
Bkr Sec. Plug: Dual
Ground Sensors: X
Rear Access: Full Height Hinged Panel - Padlocked
Frame Hrdwr: Grade 5 (Zinc Chromate) Steel
Channel Sills:
Floor Plates: X
Cable Compartment
Cable Entry: Top & Bottom
TOC Switch: 8 Pole
Surge Arrestors:
D
R
Breaker Compartment
Bkr Shutters: Grounded Metal
Cable Lug Boots: X
Bkr Kirk Lock: None
Cable Supports: X
Bkr Door Tr/Cl PB:
Front Door Construction
Front Door Hrdwr: MPL-Pull Handle
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8