SAFEGEAR JOB SPECIFICATION

Drawing No:

Status:

1VAL314911A0000

RELEASED

Shop Order No.:

Line Item No.:

Serial No.:

Engineer:
AAM
Date:
2/8/24

Approved:
ESV
Date:
2/8/24

Cust P.O.:
1173
Rev:

CS03149

A01

1VALCS03149A01

The information contained in this document
has to be kept strictly confidential.
Any unauthorized use, reproduction,
distribution or disclosure to third parties is
strictly forbidden. ABB reserves all rights
regarding Intellectual Property Rights.
© Copyright 2023 ABB.
All rights reserved.

GENERAL INFORMATION

Rev.

Sold To: FGC CONSTRUCTION LLC

4916 E BROADWAY

MADISON, WI 53716

UL Label: X

For: SLAC NATIONAL ACCELERATOR LAB

2575 SAND HILL ROAD M/S 1

MENLO PARK, CA 94025

IBC Cert:

Nuclear Cert:

AF
T

CSA 22.2, no. 31 Certification with cUL Label

Product Type: SafeGear IEEE Type 2B
A/R Arc Duration Time: 10 Cycle
Rated Voltage: 15kV

System Voltage: 12.47kV
Main Bus Rating: 3000 A
kA Rating: 50kA

R

System Source Type: 3 Phase Wye - Solid Ground
Freq: 60 Hz

D

Construction: Indoor Gasketed Doors/Filters

Environmental: Rodent proof

Seismic Reinforced: CBC 2019

Ip=1.0

Paint Finish: ANSI 61-light gray exterior galvalum interior Special Color:
Undercoating:
Mimic Bus: None

Cert Prod Test Reports:

Swgr

Breakers

CT's

PT's

X

X

X

X

Cert of Conformance:
Customer Visit:

Inspection

Test

Sheet 1 of 4



SAFEGEAR JOB SPECIFICATION

Drawing No:

Status:

1VAL314911A0000

RELEASED

Shop Order No.:

Line Item No.:

Serial No.:

Engineer:
AAM
Date:
2/8/24

Approved:
ESV
Date:
2/8/24

Cust P.O.:
1173
Rev:

CS03149

A01

1VALCS03149A01

The information contained in this document
has to be kept strictly confidential.
Any unauthorized use, reproduction,
distribution or disclosure to third parties is
strictly forbidden. ABB reserves all rights
regarding Intellectual Property Rights.
© Copyright 2023 ABB.
All rights reserved.

MECHANICAL INFORMATION

Rev.

Frame Construction
Match & Line:
Ref. S.O.
Frame Depth: 92 inches
Plenum Required: External Strapping

Bkr Pri Bushing: Epoxy

AF
T

Enclosure Vent: Screened Louvers (Rodent Proof)

Bkr Sec. Plug: Dual

Ground Sensors: X

Rear Access: Full Height Hinged Panel - Padlocked
Frame Hrdwr: Grade 5 (Zinc Chromate) Steel
Channel Sills:

Floor Plates: X

Cable Compartment

Cable Entry: Top & Bottom

TOC Switch: 8 Pole

Surge Arrestors:

D

R

Breaker Compartment

Bkr Shutters: Grounded Metal

Cable Lug Boots: X

Bkr Kirk Lock: None

Cable Supports: X

Bkr Door Tr/Cl PB:

Front Door Construction
Front Door Hrdwr: MPL-Pull Handle