Draft B2 05.1 Fixed Price Construction
Updated
A PDF document (920 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf
The full file is for paid members, or buy this bid alone.
Preview
GENERAL TERMS AND CONDITIONS
For Fixed Price Construction Subcontracts
23.
24.
25.
PREPARATIONS, STORAGE, AND ANCILLARY
26.
27.
ASSUMPTION OF RISK UNTIL FINAL
28.
7.
29.
8.
30.
9.
SUBCONTRACTOR AND SUB-SUBCONTRACTOR
31.
JUSTIFICATION FOR PRICING CHANGES OR
10.
32.
11.
33.
12.
TERMINATION FOR THE CONVENIENCE OF THE
13.
COOPERATION WITH OTHER SUBCONTRACTORS
34.
TERMINATION FOR DEFAULT DAMAGES FOR
14.
35.
PAYMENTS TO SUBCONTRACTOR AND
15.
ENVIRONMENTAL, SAFETY, AND HEALTH
36.
CONFIDENTIALITY AND RELEASE OF
16.
ENVIRONMENTAL PROTECTION REQUIREMENTS
37.
17.
INJURY AND ILLNESS PREVENTION PROGRAM
38.
39.
18.
40.
19.
41.
20.
ENVIRONMENTAL, SAFETY, AND HEALTH
COMPLIANCE, OVERSIGHT, AND ENFORCEMENT
SITE SECURITY AND SENSITIVE FOREIGN
42.
21.
RETURN OF BUYER BADGES, KEYS, AND
43.
FEDERAL CONTRACT CLAUSES INCORPORATED
22.
44.
FLOW-DOWN OF SUBCONTRACT PROVISIONS ... 22
1.
DEFINITIONS
INDEX
2.
3.
4.
SITE INVESTIGATION, REPRESENTATIONS, AND
5.
6.
D
R
AF
T
1.
The primary defined terms used in this Subcontract are as follows, with other defined terms included throughout the Subcontract: a.
“Beneficial Use” shall mean the point at which all phases of work, scopes of work, and parts or portions of the Project for which the Buyer and/or SLAC intends to use may be used for those intended purposes. “Substantial Completion” shall have the same meaning as “Beneficial Use” hereunder.
b.
“Buyer” means the Board of Trustees of the Leland Stanford Jr. University (“University”), or any duly authorized representative thereof, acting through SLAC National Accelerator Laboratory (“SLAC”), under its Management and Operating Contract with the United States Department of Energy (“DOE”).
GENERAL TERMS AND CONDITIONS FOR FIXED PRICE CONSTRUCTION
March 2024
“Change Order” shall mean a mutually executed instrument, signed by the Buyer or its Subcontract Administrator (or both), and the Subcontractor, indicating their express written agreement upon any change in the Contract Documents, including any change in the Work, the amount of adjustment to the Contract Sum (if any) and extent of adjustment to the Contract Time (if any).
d.
“Construction Manager (CM)” shall mean the individual specifically designated by the Buyer to monitor the technical performance of the Subcontractor and all Sub-Subcontractors, to assure compliance with the technical specifications of the contract.
e.
“Final Completion” shall mean the date on which the Subcontractor has (a) completed all requirements for Substantial Completion and remaining Work such that all Work is complete; (b) obtained permanent occupancy permits, where applicable; (c) submitted any final
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8