SUPPLY CHAIN MANAGEMENT

Section H – Special Terms and Conditions
Special Article 1: Reserved
Special Article 2: Reserved
Special Article 3: Reserved
Special Article 4: Electronic Web Submittal of Labor Compliance Reports (Davis-Bacon)

AF
T

Each Subcontractor and Lower-tier subcontractor shall submit weekly certified payroll reports and labor compliance documentation electronically to SLAC utilizing Labor Compliance Program Tracker (LCPtracker), a web-based software tool. Access to LCPtracker is granted by SLAC; each Subcontractor will be issued a unique log-on identification and password. Special Article 5: Field Change Order Authority

R

The Construction Manager (CM) or the Project Manager (PM) is authorized, in accordance with Article 30 of the General Terms and Conditions for Fixed Price Construction Subcontracts, (Section G), to issue Field Change Order(s) with a Not-To-Exceed (NTE) amount of up to a maximum amount of Twenty-Five Thousand dollars ($25,000.00). The Subcontract Administrator may change the NTE authority of the CM or PM by subcontract modification.
Field Change Order(s) greater than Twenty-Five Thousand dollars ($25,000.00) are required to be issued by the Subcontract Administrator.

D

Special Article 6: Key Personnel

The personnel specified below are considered essential to the work performed hereunder. The Subcontractor shall notify the Subcontract Administrator in writing 30 calendar days prior to changing key personnel of its own volition. Notification shall include justification (including proposed replacement) in sufficient detail to permit evaluation of the impact on the performance of this Subcontract. No replacement shall be made by the Subcontractor without the written consent of the Subcontract Administrator. The list of key personnel may be modified during the course of this Subcontract to either add or delete personnel, as appropriate.

NAME

TITLE

Project Manager
Project Field Superintendent
Site Safety Officer

Special Article 7: Reserved
Special Article 8: Subcontract Administration

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION H (REV. 06/04/12)

SLAC-SCM-GEN-034

A. The University’s contractual representative for this Subcontract is Quyen Weng. The contractual representative is the only person authorized to make changes in the requirements of this Subcontract or to make modifications to this Subcontract, including changes or modifications to