Draft B2 08.0 Request for Proposals Section J (List of Attachments)
Updated
A PDF document (596 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf
The full file is for paid members, or buy this bid alone.
Preview
SUPPLY CHAIN MANAGEMENT
Section J – List of Attachments
Document Type
Attachment 1
Attachment 2
Description
Construction Wage Rate Determination
CA20260018 – Mod No. XX
Subcontractor Safety Injury and Illness Prevention
Plan Acknowledgement Form (IIPP)
Pages
Date
September 17, 2026
May 27, 2026
Standard Form SF1413
Rev. 10/2023
Attachment 4
Small Business Subcontracting Plan Model
October 7, 2026
Attachment 5
Subcontractor Safety Qualification Form (SQF)
May 21, 2021
Attachment 6
NTP Submittal Checklist
June 14, 2024
Attachment 7
Final Inspection Report
N/A
Attachment 8
Construction Subcontracts Final Release
December 16, 2020
Attachment 9
Labor Rate Sheet (Subcontractor must furnish)
N/A
N/A
D
R
AF
T
Attachment 3
SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy
SECTION J (REV. 06/04/12)
SLAC-SCM-GEN-036
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8