Draft B2 08.3 SF1413
Updated
A PDF document (638 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_08.3_SF1413.pdf
The full file is for paid members, or buy this bid alone.
Preview
OMB Control Number: 9000-0066
Expiration Date: 5/31/2027
Statement And Acknowledgment
Part I - Statement Of Prime Contractor
1. Prime Contract Number 2. Date Subcontract 3. Subcontract Number Awarded
4. Prime Contractor
a. Name
5. Subcontractor
a. Name
b. Street Address
b. Street Address
c. City
d. State e. ZIP Code c. City
d. State e. ZIP Code
6. The prime contract
does,
does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."
a. Name Of Awarding Firm
AF
T
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:
D
8. Project
R
b. Description Of Work By Subcontractor
10a. Name Of Person Signing
9. Location
11. By (Signature)
12. Date Signed
10b. Title Of Person Signing
Part II - Acknowledgment Of Subcontractor
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:
Construction Wage Rate Requirements
Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Apprentices and Trainees Payrolls and Basic Records
Compliance with Copeland Act
Withholding of Funds
Requirements
Disputes Concerning Labor Standards
Subcontracts (Labor Standards)
Compliance with Construction Wage Rate Requirements
Contract Termination - Debarment
and Related Regulations
Certification of Eligibility
Authorized For Local Reproduction
Previous Edition Is Not Usable
STANDARD FORM 1413 (REV. 10/2023)
Prescribed by GSA/FAR (48 CFR) 53.222(e)
14. Name(s) Of Any Intermediate Subcontractors, If Any
A
C
B
D
15a. Name Of Person Signing
16. By (Signature)
17. Date Signed
15b. Title Of Person Signing
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time
AF
T
estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8