Draft B2 08.5 SubcontractorFormSQF
Updated
A PDF document (776 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_08.5_SubcontractorFormSQF.pdf
The full file is for paid members, or buy this bid alone.
Preview
Chapter 42: Subcontractor Safety
Subcontractor Safety Qualification Form
ENVIRONMENT, SAFETY & HEALTH DIVISION
Product ID: 456 | Revision ID: 2364 | Date Published: 21 May 2021 | Date Effective: 21 May 2021 URL: https://www-group.slac.stanford.edu/esh/eshmanual/references/subcontractorFormSQF.pdf
This form applies to prime subcontractors (those directly contracted to SLAC)1, performing construction work 2 or high-risk service work3 (see Subcontractor Safety: Non-green Work Procedure [SLAC-I-730-0A21C-024]). The safety qualification is valid for (a) one year and (b) the type of work listed below. Please fill out this form completely. Do not leave items blank and provide all required supporting documents. SLAC reserves the right to accept or reject any directly-contracted subcontractor based on the qualification criteria. SLAC may also require conditions of acceptance. If the subcontractor acts as the general subcontractor, SLAC will evaluate whether it has adequate knowledge and experience to supervise lower tier subcontractors.
1 Company
Year Founded
Address
Phone
License Classifications (if construction use California License Classification)
License #
AF
T
Company Name
2 Types of Work / Trades
List types of work and/or trades, whether self-performed or managed, to be done at SLAC (qualification will be valid for what is listed). Your firm must be properly licensed in California to perform the proposed work. Manage?
Self-perform?
D
R
Description (if construction list California License Classification and description: eg, B - General Building)
As SLAC is a contractor to the Department of Energy, all outside contractors working at SLAC are considered subcontractors. Consequently, a contractor considered a “general contractor” outside of SLAC is considered a “general subcontractor” at SLAC.
Construction work is defined as the combination of erection, installation, assembly, demolition, or fabrication activities involved to create a new facility or to alter, add to, rehabilitate, dismantle, or remove an existing facility. It also includes the alteration and repair (including dredging, excavating, and painting) of buildings, structures, or other real property, as well as any construction, demolition, and excavation activities conducted as part of environmental restoration or remediation efforts.
Service work is defined as any work involving maintenance, repair, cleaning, or testing; technical or administrative services; or other tasks that are not construction activities. Service work may be associated with a construction project. High-risk service work is service work that has an
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8