Draft B2 08.8 Construction Subcontracts Release
Updated
A PDF document (608 KB) attached to SLAC CUIR SP1 Master Substation Annex Building Construction, from the Department of Energy. Due Oct 27, 2026, 5:00 PM (UTC-7).
File name: DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf
The full file is for paid members, or buy this bid alone.
Preview
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
FINAL RELEASE
Subcontract No: xxxxxx
Project Title: XXXXXX
In consideration of the sum of <<WRITTEN VALUE>> Dollars and 00/100s <<$NUMERIC VALUE>> paid or to be paid by check from SLAC National Accelerator Laboratory (SLAC), a federal research center,to GC NAME, which is in full and final payment for work done and services provided on the above referenced subcontract, the undersigned hereby releases Stanford University SLAC, and the Department of Energy from its and any lower-tier subcontractor or agent claims, adjustments, demands for payments, damages, stop notices, or bond rights on the work covered by Subcontract No. xxxxxx, located at SLAC . Further, the final payment to the undersigned constitutes complete and entire compensation for all labor, services, equipment, or material furnished or any and all other compensation due, except for disputed claims for additional work in the amount of: (outstanding retainage amount)__
AF
T
$
(If none, state none), which have been submitted in writing to SLAC.
The undersigned does hereby represent and warrant that the undersigned has fully paid for all labor and materials, any and all welfare, pension, vacation, or other contributions required to be made on account of the employment of such laborers or mechanics so provided by the undersigned and does hereby agree to indemnify, defend, and hold harmless Stanford University and the U.S. Dept. of Energy, the Project, and any affected real property from any and all claims, liens, claims of lien, liabilities, obligations, and demands arising from any of the work performed by the undersigned or its subcontractors on said subcontract.
D
R
This waiver and release is for the benefit of, and may be relied upon by, Stanford University and the U.S. Dept. of Energy. The Subcontractor recognizes and acknowledges that the SLAC National Accelerator Laboratory is a Federally Funded Research and Development Center, owned by the U.S. Department of Energy, and operated by Stanford University on behalf of the U.S. DOE; that all construction work on the site is performed for and all improvements, equipment, and facilities are totally owned by the United States Government and are exempt from the application of state lien laws or stop payment provisions; and that Stanford University, as the owner of only the reversionary interest in the acreage, has no interest subject to lien.
Our work is complete on the project at this time and there will be no further billing to the above named
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8