Section L - Attachment A
COST DETAIL BREAKDOWN
CUIR SP1 Master Substation Annex Construction
RFP #:
368509
Subcontractor:
Labor
DESCRIPTION
Material Cost
T
Cost
AF
D
R
Base Scope Direct Costs
02 00 00 Demolition/Temp. Construction
03 00 00 Concrete
04 00 00 Masonry
05 00 00 Steel/Misc. Steel
06 00 00 Woods/Plastics/Composites/Millwork
07 00 00 Moisture Protection/Insulation/Roofing
08 00 00 Openings/Windows/Doors/Hardware
09 00 00 Finishes
10 00 00 Specialties
11 00 00 Equipment
12 00 00 Furnishings
13 00 00 Special Construction
14 00 00 Conveying
21 00 00 Fire Protection
22 00 00 Plumbing
23 00 00 Heating, Venting & Air Conditioning
26 00 00 Electrical
27 00 00 Communications
28 00 00 Safety/Security/Access Control
31 00 00 Earthwork
32 00 00 Exterior Improvements
33 00 00 Utilities
41 00 00 Material Handling
Direct Costs Subtotal
Base Scope Indirect Costs
General Conditions
General Requirements/Site Requirements
Bonds and Insurance
Overhead and Profit
Indirect Costs Subtotal
MH
Total Cost
Equipment Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
-
TOTAL BASE SCOPE $
-
R
D
T
AF
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft B2 00 Cover Letter
- Draft B2 01 Request for Proposals Section A (Subcontract Form)
- Draft B2 02 Request for Proposals Section B (Supplies or Services and Price Costs
- Draft B2 03.00 Request for Proposals Section C (Specifications Statement of Work)
- Draft B2 03.01 Statement of Work
- Draft B2 03.03 Commissioning Plan
- Draft B2 03.04 CUIR Subproject 1 Power Outages and Linac Downtime Plan
- Draft B2 03.05 CUIR's Quality Requirements for Subcontractors
- Draft B2 03.06 Department of Energy Order 414.1E Quality Assurance
- Draft B2 03.08 00 Appendix I Technical Data Submittal
- Draft B2 03.09 01 Packaging Procedure MV Switchgear Shipping Preparation-2
- Draft B2 03.12 Certified Test Reports SWGR9 SWGR8