Section L - Attachment A

COST DETAIL BREAKDOWN

CUIR SP1 Master Substation Annex Construction
RFP #:
368509
Subcontractor:

Labor

DESCRIPTION

Material Cost

T

Cost

AF

D

R

Base Scope Direct Costs

02 00 00 Demolition/Temp. Construction

03 00 00 Concrete

04 00 00 Masonry

05 00 00 Steel/Misc. Steel

06 00 00 Woods/Plastics/Composites/Millwork

07 00 00 Moisture Protection/Insulation/Roofing

08 00 00 Openings/Windows/Doors/Hardware

09 00 00 Finishes

10 00 00 Specialties

11 00 00 Equipment

12 00 00 Furnishings

13 00 00 Special Construction

14 00 00 Conveying

21 00 00 Fire Protection

22 00 00 Plumbing

23 00 00 Heating, Venting & Air Conditioning

26 00 00 Electrical

27 00 00 Communications

28 00 00 Safety/Security/Access Control

31 00 00 Earthwork

32 00 00 Exterior Improvements

33 00 00 Utilities

41 00 00 Material Handling

Direct Costs Subtotal
Base Scope Indirect Costs
General Conditions
General Requirements/Site Requirements
Bonds and Insurance
Overhead and Profit
Indirect Costs Subtotal

MH

Total Cost

Equipment Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

-

$
$
$
$
$

-

TOTAL BASE SCOPE $

-

R

D
T

AF