Sousley Combined Arc Flash Project - Volume 2 Data Files
Updated
A PDF document (17.1 MB) attached to LEX Triannual Energy Study and ARC Flash Testing, from the Department of Veterans Affairs. Due Nov 30, 2027, 11:00 AM (UTC-6).
File name: Sousley Combined Arc Flash Project - Volume 2 Data Files.pdf
The full file is for paid members, or buy this bid alone.
Preview
Arc Flash Hazard Analyses
Contract No. VA36C24923P0897
Contracting Officer: Lara Hampton
Phone No: (615)225-5414
Veterans Affairs Medical Center
Sousley Division
Lexington, Kentucky
Project Report - Volume 2
November 2023 – February 2024
Submitted by
Jerry M. Parks Jr., Project Manager
William
Henderson
LLC
4041 Greenfern Drive
Lockhart, Florida 32810
(407)427-0436
in cooperation with
305 Wendy Hill Road
Savannah, Georgia 31410
(803)760-3138
Cover
Arc Flash Hazard Analyses
Volume 2
Contract No. VA36C24923P0897
Veterans Affairs Medical Center – Sousley Division
Lexington, Kentucky
November 2023 – February 2024
Section 1
Equipment Data Files (by building)
Arc Flash Hazard Analyses, Contract No. 36C24923P0897
VA Medical Center – Sousley Division - Lexington, Kentucky
Equipment Data Schedules
Enclosed are the data schedules for each piece of equipment evaluated under this arc flash hazard analyses. Data schedules have been grouped by location. Each major group is separated by a red divider page to distinguish the groups.
The groups are categorized as follows:
Building 1
Building 2
Building 3
Building 4
Building 9
Building 12
Building 16
Building 17
Building 20
Building 22
Building 25
Building 27
Building 28
Building 29
Building 32
Building 37
Building 39
Building 46
Building 47
Building 48
Building 67
Building 68
Building 74
Building 75
Building 76
Building 100
Building 112
Arc Flash Hazard Analyses, Contract No. 36C24923P0897
VA Medical Center – Sousley Division - Lexington, Kentucky
Equipment Data Schedules (Continued)
Building 117
Building 120
Building 122
Building 124
Hazmat Building
Building 201/202
Building 206 (Fisher House)
Medium Voltage Equipment
Cable Schedule
Location:
Building 1
Power
Location
Not in Service
Source
Load
Equipment Type
Size
Neutral
Phases
Type
Ground
Phases
Qty
Neutral
Ground
Distance
PMT-1
MSB69
Switchboard
600 MCM
600 MCM
1/0 AWG
THWN
50'
MSB69
MP1
DP Panel
500 MCM
500 MCM
1/0 AWG
THWN
95'
MSB69
1LP1
Panel
4/0 AWG
4/0 AWG
#4 AWG
THWN
110'
MSB69
1LP6
Panel
4/0 AWG
4/0 AWG
#4 AWG
THWN
110'
MSB69
1LP11
Panel
4/0 AWG
4/0 AWG
#4 AWG
THWN
130'
MSB69
1LP16
Panel
4/0 AWG
4/0 AWG
#4 AWG
THWN
150'
MSB69
1LP19
Panel
4/0 AWG
4/0 AWG
#4 AWG
THWN
205'
MSB69
1XP1
Panel
500 MCM
500 MCM
1/0 AWG
THWN
240'
MSB69
Splice Box
Splice Box
4/0 AWG
4/0 AWG
#4 AWG
THWN
65'
Splice Box
1MCC-1
MCC
4/0 AWG
4/0 AWG
#4 AWG
THWN
10'
Splice Box
1LP12
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Bid document
- Bid document
- Bowling B MV One Line
- Bowling Combined Arc Flash Project - Volume 2 Data Files
- Bowling Electrical Main Hospital One Line
- Bowling Electrical Risers
- Bowling ONE-LINE E-602-1
- Bowling Tests Summary
- Bowling Tower Gen 1 2 One Line
- Bowling Tower SWB SBA SBC SBD SBE SBH One Line
- Bowling Tower SWB SBB SBF SBG One Line